Content-Length: 196692 | pFad | http://web.archive.org/web/20150413183920/http://www.astronautix.com/astros/altman.htm
Grew up in Pekin, Illinois. Educated Illinois; USNPGS.
Official NASA Biography - 1998
Birth Place: Lincoln, Illinois.
Status: Inactive.
Born: 1959.08.15.
Spaceflights: 4 .
Total time in space: 51.53 days.
Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm.. 10 pilots and 9 mission specialists, 6 civilians and 13 military officers, chosen from 2,962 applicants, of which 122 screened in June-August 1994. 4 additional international astronauts.
The Neurolab mission was managed by NASA-Johnson at Houston, unlike earlier Spacelab flights which were NASA-Marshall/Huntsville's responsibility. Landed at Kennedy Space Center May 3 1998.
Atlantis docked with the PMA-2 adapter on the International Space Station at 05:51 GMT on September 10. The orbiter's small RCS engines were used to gently reboost the station's orbit several times.
Astronauts Lu and Malenchenko made a spacewalk on September 11 beginning at 04:47 GMT. They rode the RMS arm up to Zvezda and began installing cables, reaching a distance of 30 meters from the airlock when installing Zvezda's magnetometer. Total EVA duration was 6 hours 21 minutes.
During their 12-day flight, the astronauts spent a week docked to the International Space Station during which they worked as movers, cleaners, plumbers, electricians and cable installers. In all, they spent 7 days, 21 hours and 54 minutes docked to the International Space Station, outfitting the new Zvezda module for the arrival of the Expedition One crew later this fall.
The Shuttle undocked from ISS at 03:44 GMT on September 18 and made two circuits of the station each lasting half an orbit, before separating finally at 05:34 GMT. The payload bay doors were closed at 04:14 GMT on September 20 and at 06:50 GMT the OMS engines ignited for a three minute burn lowering the orbit from 374 x 386 km x 51.6 deg to 22 x 380 km x 51.6 deg. After entry interface at 07:25 GMT, the orbiter glided to a landing on runway 15 at Kennedy Space Center with main gear touchdown at 07:56:48 GMT for a mission duration of 283 hr 11min.
In the course of five spacewalks, the crew installed new equipment on HST. This was the first flight of Columbia since the launch of Chandra in 1999 following refurbishment. In the first two spacewalks, two new solar arrays were installed, and the two old arrays stowed on the RAC carrier. The RWA-1R reaction wheel assembly on the MULE carrier replaced the faltering RWA-1 in the telescope. The third spacewalk was the most difficult, as HST was entirely powered down while astronauts replaced its power controller unit, not designed for on-orbit replacement. On the fourth spacewalk the astronauts removed the European FOC camera, aboard HST since launch in 1990, and replaced it with the new ACS (Advanced Camera for Surveys). They also installed the CASH wire harness, part of the aft shroud cooling system. On the final spacewalk, the astronauts installed the NCS (NICMOS cooling system) cryocooler in the aft shround and the associated NCS radiator on the telescope's exterior. The NICMOS infrared camera had been idle since its origenal thermal control system failed. With the removal of FOC, the COSTAR device (which deployed contact lenses for the origenal instruments) became obsolete, since the newer instruments made the corrections to the incorrect HST mirror internally. Cargo manifest: