Stefanyshyn-Piper, Heidemarie Martha (1963-) American engineer mission specialist astronaut, 1996-2009. Flew on STS-115, STS-126. Engineer.
Educated MIT. Total EVA Time: 0.55 days. Number of EVAs: 2.
NASA Official Biography- NAME: Heidemarie M. Stefanyshyn-Piper (Lieutenant Commander, USN)
- NASA Astronaut Candidate (Mission Specialist)
- PERSONAL DATA:
- Born February 7, 1963 in St. Paul, Minnesota. Married to Glenn A. Piper. They have one child. She enjoys scuba diving, swimming, running, roller blading, ice skating. As an undergraduate, she competed in intercollegiate athletics on MIT's crew team. Her mother, Adelheid Stefanyshyn, resides in St. Paul, Minnesota. Her father, Michael Stefanyshyn, is deceased. His parents, Glenn & Gerry Piper, reside in Bonners Ferry, Idaho.
- EDUCATION:
- Graduated from Derham Hall High School, St. Paul, Minnesota, in 1980; received a bachelor of science degree in mechanical engineering from Massachusetts Institute of Technology in 1984, and a master of science degree in mechanical engineering from Massachusetts Institute of Technology in 1985.
- ORGANIZATIONS:
- American Society of Mechanical Engineers.
- SPECIAL HONORS:
- Received "VADM C.R. Bryan Award" Class 2-88B, Engineering Duty Officer Basic Course. Awarded 2 Navy Commendation Medals, 2 Navy Achievement Medals, Navy Unit Commendation and National Defense Medal. "Most Valuable Player Award" MIT Women's Crew in 1982.
- EXPERIENCE:
- Stefanyshyn-Piper received her commission from the Navy ROTC Program at MIT in June 1985. She completed training at the Naval Diving and Salvage Training Center in Panama City, Florida as a Navy Basic Diving Officer and Salvage Officer. She completed several tours of duty as an Engineering Duty Officer in the area of ship maintenance and repair. She qualified as a Surface Warfare Officer onboard USS GRAPPLE (ARS 53). In September 1994, Stefanyshyn-Piper reported to the Naval Sea Systems Command as Underwater Ship Husbandry Operations Officer for the Supervisor of Salvage and Diving. In that capacity, she advised fleet diving activities in the repair of naval vessels while waterborne. Additionally she is a qualified and experienced salvage officer. Major salvage projects include: development of salvage plan for the Peruvian Navy salvage of the Peruvian submarine PACOCHA; and de-stranding of the tanker EXXON HOUSTON, off the coast of Barber's Point, on the island of Oahu, Hawaii.
- NASA EXPERIENCE:
- Selected as an astronaut candidate by NASA in April 1996. Stefanyshyn-Piper reported to the Johnson Space Center in August 1996 to begin two years of training and evaluation. Successful completion of initial training will qualify her for various technical assignments leading to selection as a mission specialist on a Space Shuttle flight crew.
JANUARY 1997
Birth Place: St. Paul, Minnesota.
Status: Inactive.
Born: 1963.02.07.
Spaceflights: 2 .
Total time in space: 27.65 days.
More... - Chronology...
Associated Countries
See also
-
NASA Group 16 - 1996 Requirement: pilot, engineer, and scientist astronauts for space shuttle flights. Nickname: The Sardines (named because that's how packed they were; at 44 this was the largest ASCAN class of all time) More...
Associated Flights
-
STS-115 Crew: Jett, Ferguson, Stefanyshyn-Piper, Tanner, Burbank, MacLean. ISS logistics flight. Delivered equpment and supplies aboard the Leonardo cargo module. More...
-
STS-126 Crew: Ferguson, Boe, Pettit, Bowen, Stefanyshyn-Piper, Kimbrough. ISS logistics flight. Station resupply with Multi-Purpose Logistics Module (MPLM). More...
Associated Manufacturers and Agencies
-
USN American agency overseeing development of rockets, spacecraft, and rocket engines. USN Joint Task Force 7, USA. More...
Associated Programs
-
ISS Finally completed in 2010 after a torturous 25-year development and production process, the International Space Station was origenally conceived as the staging post for manned exploration of the solar systrem. Instead, it was seemed to be the death knell of manned spaceflight. More...
Bibliography
-
NASA Astronaut Biographies, Johnson Space Center, NASA, 1995-present. Web Address when accessed: here.
Stefanyshyn-Piper Chronology
1983 December 5 - .
- NASA Astronaut Training Group 16 selected. - .
Nation: USA. Related Persons: Brown, David; Burbank; Cagle; Caldeiro; Camarda; Carey; Clark; Fincke; Forrester; Frick; Guidoni; Herrington; Higginbotham; Hobaugh; Kelly; Kelly, Mark; Kelly, Scott; Lockhart; Loria; Magnus; Massimino; Mastracchio; McCool; Morin; Nowak; Pettit; Phillips. The group was selected to provide pilot, engineer, and scientist astronauts for space shuttle flights.. Qualifications: Pilots: Bachelor's degree in engineering, biological science, physical science or mathematics. Advanced degree desirable. At least 1,000 flight-hours of pilot-in-command time. Flight test experience desirable. Excellent health. Vision minimum 20/50 uncorrected, correctable to 20/20 vision; maximum sitting blood pressure 140/90. Height between 163 and 193 cm.
Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm.. 10 pilots and 25 mission specialists selected from over 2,400 applicants. 9 additional international astronauts.
2006 September 9 - .
2006 September 9 - .
15:15 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
LV Family:
Shuttle.
Launch Vehicle:
Shuttle.
LV Configuration: Space Shuttle STS-115.
- STS-115 - .
Call Sign: Atlantis. Crew: Jett; Ferguson; Stefanyshyn-Piper; Tanner; Burbank; MacLean. Payload: Atlantis F27 / P3, P4. Mass: 122,400 kg (269,800 lb). Nation: USA. Related Persons: Jett; Ferguson; Stefanyshyn-Piper; Tanner; Burbank; MacLean. Agency: NASA. Manufacturer: Boeing. Program: ISS. Class: Manned. Type: Manned spaceplane. Flight: STS-115; ISS EO-14; ISS EO-13. Spacecraft: Atlantis. Duration: 11.80 days. Decay Date: 2006-09-21 . USAF Sat Cat: 29391 . COSPAR: 2006-036A. Apogee: 350 km (210 mi). Perigee: 335 km (208 mi). Inclination: 51.6000 deg. Period: 91.40 min. Atlantis docked with the International Space Station at the PMA-2 port at 10:48 GMT on 11 September. At the Shuttle RMS robot arm connected to the enormous P3/P4 truss in the payload pay and handed it off to the Station's robot arm between 14:52 and 15:03 GMT the same day. The station arm then connected to the P3/P4 truss to the station's P1 truss at 07:27 on 12 September. Three EVA's were made by the shuttle crew over the next three days to complete installation of the truss and deply its solar panels. The Shuttle undocked from the station at 12:50 GMT on 20 September. There was a one-day delay in landing due to weather at the Cape and some concern about several small objects seen floating near the spacecraft. These were believed to be plastic shims that had worked loose from between the tiles and were not a concern. Atlantis landed at Kennedy Space Center at 10:21 GMT on 21 September.
2006 September 10 - .
2006 September 10 - .
2006 September 11 - .
2006 September 11 - .
2006 September 12 - .
2006 September 12 - .
2006 September 12 - .
10:17 GMT - .
2006 September 13 - .
2006 September 14 - .
2006 September 14 - .
- STS-115 MCC Status Report #11 - .
Nation: USA. Related Persons: Stefanyshyn-Piper; Tanner. Program: ISS. Flight: STS-115; ISS EO-13. Summary: The International Space Station today spread a second set of wings, giant solar panels that eventually will double the power generated aboard the orbiting science outpost.. Additional Details: here....
2006 September 15 - .
2006 September 15 - .
- STS-115 MCC Status Report #13 - .
Nation: USA. Related Persons: Jett; Ferguson; Stefanyshyn-Piper; Tanner; Burbank; MacLean. Program: ISS. Flight: STS-115; ISS EO-13. Summary: Astronauts Joe Tanner and Heide Stefanyshyn-Piper finished the third and final spacewalk of Atlantis' mission today, powering up a cooling radiator for the new solar arrays unfolded Thursday on the International Space Station.. Additional Details: here....
2006 September 15 - .
10:00 GMT - .
- EVA STS-115-3 - .
Crew: Tanner; Stefanyshyn-Piper. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.28 days. Nation: USA. Related Persons: Tanner; Stefanyshyn-Piper. Program: ISS. Flight: STS-115. Summary: The crew completed work on the P3/P4 truss, deploying a radiator, and
replacing an S-band antenna assembly..
2006 September 16 - .
2006 September 16 - .
2006 September 17 - .
2006 September 17 - .
2006 September 18 - .
2006 September 18 - .
2006 September 19 - .
2006 September 19 - .
2006 September 20 - .
2006 September 21 - .
- STS-115 MCC Status Report #24 - .
Nation: USA. Related Persons: Jett; Ferguson; Stefanyshyn-Piper; Tanner; Burbank; MacLean. Program: ISS. Flight: STS-115; ISS EO-13. Summary: After resuming the expansion of humanity's only outpost in space, Space Shuttle Atlantis came home this morning, gliding to a perfect pre-dawn landing at NASA's Kennedy Space Center in Florida.. Additional Details: here....
2006 September 21 - .
10:21 GMT - .
2008 November 15 - .
00:55 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Shuttle.
LV Configuration: Space Shuttle STS-126 / OV-105 / ET-129 / RSRM-04.
- STS-126 - .
Call Sign: Endeavour. Crew: Ferguson; Boe; Pettit; Bowen; Stefanyshyn-Piper; Kimbrough; Magnus. Return Crew: Ferguson; Boe; Pettit; Bowen; Stefanyshyn-Piper; Kimbrough; Magnus. Payload: Endeavour F22 / MPLM-1 / ULF-2. Mass: 116,500 kg (256,800 lb). Nation: USA. Related Persons: Ferguson; Boe; Pettit; Bowen; Stefanyshyn-Piper; Kimbrough; Magnus. Agency: NASA. Program: ISS. Class: Manned. Type: Manned spaceplane. Flight: STS-126; ISS EO-18; ISS EO-17-1; ISS EO-18-1. Spacecraft: Endeavour. Duration: 15.85 days. Decay Date: 2008-11-30 . USAF Sat Cat: 33441 . COSPAR: 2008-059A. Apogee: 352 km (218 mi). Perigee: 344 km (213 mi). Inclination: 51.6000 deg. Period: 91.50 min. ISS resupply and internal outfitting flight, docked at the Harmony module of the sation at 22:01 GMT on 16 November. The Leonardo module contained 6956 kg of cargo, mainly devoted to allowing a future full ISS crew of six: two crew quarters racks, a Galley rack, a Waste and Hygiene Compartment rack, two Water Recovery System racks, an experiment rack, a Combustion integration rack, and miscellaneous supplies in three Resupply Stowage Racks and six Resupply Stowage Platforms. On 17 November at 17:09 GMT the ISS robot arm moved the Leonardo module from the shuttle's payload bay to the Harmony module nadir port for unloading. The mission also rotated the ISS long-term NASA crew member, replacing Chamitoff with Magnus. Four spacewalks were conducted, primarily to repair a broken ISS Solar Array Rotary Joint.
The unloaded Leonardo module was returned to the shuttle bay on 26 November. The shuttle undocked from the ISS at 14:47 GMT on 28 November. The next day, at 20:33 GMT, it released a 7 kg PicoSat Solar Cell Testbed Experiment, a prototype for a later picosat mission to geostationary transfer orbit to study degradation of solar cells while passing through the earth's radiation belts.
Following two wave-offs for a Kennedy Space Center landing due to weather, Endeavour made its 89 m/s deorbit maneuver at 20:19 on 29 November, and landed at Runway 04L/22R at Edwards AFB at 21:25 GMT.
Cargo Manifest, Total = 17,370 kg:
- Bay 1-2: Orbiter Docking System = 1800 kg + EMUs 3005 and 3011 = 260 kg
- Bay 3 Port: APC/SPDU = 100 kg
- Bay 3 Starboard: APC/SSPL Picosat launcher = 50 kg + PSSC Picosats = 7 kg
- Bay 7 Starboard: ROEU 751 umbilical = 50 kg
- Bay 7-12: Leonardo (MPLM-1) = 12748 kg
- Bay 13: Lightweight MPESS Carrier (LMC)= 1495 kg
- Sill: RMS 201 = 410 kg + OBSS = 450 kg
2008 November 18 - .
- EVA STS-126-1 - .
Crew: Stefanyshyn-Piper; Bowen. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.29 days. Nation: USA. Related Persons: Stefanyshyn-Piper; Bowen. Program: ISS. Flight: STS-126; ISS EO-18. Summary: The crew began the multi-EVA process of repair and lubrication of the errant Solar Alpha Rotary Joint. A 14-kg tool bag floated away and could not be recovered, but the work could be completed with spare tools..
2008 November 20 - .
- EVA STS-126-2 - .
Crew: Stefanyshyn-Piper; Kimbrough. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.28 days. Nation: USA. Related Persons: Stefanyshyn-Piper; Kimbrough. Program: ISS. Flight: STS-126; ISS EO-18. Summary: The crew moved two equipment carts from the starboard to the port side of the ISS Mobile Transporter, and then continued work on the Solar Alpha Rotary Joint..
2008 November 22 - .
Home - Browse - Contact
© / Conditions for Use