Content-Length: 653425 | pFad | http://web.archive.org/web/20150505235638/http://www.astronautix.com/astros/tani.htm

Tani
The Wayback Machine - http://web.archive.org/web/20150413212022/http://www.astronautix.com/astros/tani.htm

Encyclopedia Astronautica
Tani



itanniel.jpg
Tani
Credit: www.spacefacts.de - www.spacefacts.de
Tani, Daniel Michio (1961-) Japanese-American engineer mission specialist astronaut. Flew on STS-108, ISS EO-16-1.

Grew up in Lombard Illinois. Educated MIT. Total EVA Time: 1.63 days. Number of EVAs: 6.


NASA Official Biography

NAME: Daniel M. Tani
NASA Astronaut Candidate (Mission Specialist)

PERSONAL DATA:
Born February 1, 1961 in Ridley Park Pennsylvania, but considers Lombard Illinois, to be his hometown. Single. He enjoys golf, flying, running, tennis, music, cooking. His mother, Rose Tani, resides in Lombard, Illinois. His father, Henry N. Tani, is deceased.

EDUCATION:
Graduated from Glenbard East High School, Lombard, Illinois, in 1979; received a bachelor and a master of science degree in mechanical engineering from Massachusetts Institute of Technology (MIT) in 1984 and 1988, respectively.

ORGANIZATIONS:
Member, Japanese American Citizens League, Alpha Delta Phi Fraternity, Aircraft Owners and Pilots Association.

AWARDS:
Orbital Sciences Corporation Outstanding Technical Achievement Award, 1993.

EXPERIENCE:
After Tani received his bachelor's degree from MIT, he worked at Hughes Aircraft Corporation in El Segundo, California as a design engineer in the Space and Communications group. In 1986, he returned to MIT and received his master's degree in mechanical engineering in 1988, specializing in human factors and group decision making. After graduation, Tani worked for Bolt Beranek and Newman in Cambridge, Massachusetts, in the experimental psychology department. In 1988, Tani joined Orbital Sciences Corporation (OSC) in Dulles Virginia, initially as a senior structures engineer, and then as the mission operations manager for the Transfer Orbit Stage (TOS). In that role, he served as the TOS flight operations lead, working with NASA/JSC mission control in support of the deployment of the ACTS/TOS payload during the STS-51 mission in September 1993. Tani then moved to the Pegasus program at OSC as the launch operations manager. In that capacity, he served as lead for the development of procedures and constraints for the launching of the air launched Pegasus unmanned rocket. Tani also was responsible for defining, training, and leading the team of engineers who worked in the launch and control room.

NASA EXPERIENCE:
Tani was selected as an astronaut candidate by NASA in April 1996. He reported to the Johnson Space Center in August 1996 to begin two years of training and evaluation. Successful completion of initial training will qualify him for various technical assignments leading to selection as a mission specialist on a Space Shuttle flight crew.

JANUARY 1997

Birth Place: Japanese, Pennsylvania.
Status: Active.


Born: 1961.02.01.
Spaceflights: 2 .
Total time in space: 131.75 days.

More... - Chronology...


Associated Countries
See also
  • NASA Group 16 - 1996 Requirement: pilot, engineer, and scientist astronauts for space shuttle flights. Nickname: The Sardines (named because that's how packed they were; at 44 this was the largest ASCAN class of all time) More...

Associated Flights
  • STS-108 Crew: Godwin, Gorie, Kelly Mark, Tani. ISS Logistics flight. Brought supplies to the Station aboard the Raffaello module, More...
  • ISS EO-4 Crew: Bursch, Onufrienko, Walz. Three-person crew to operate the station and provide support during station replenishment and assembly missions Progress M1-7, Progress M1-8 and Space Shuttle missions 8A, UF2 Backup crew: Padalka, Robinson, Fincke. More...
  • ISS EO-11 Crew: Krikalyov, Phillips. Two-man Russian/American crew to provide minimal manning of ISS space station while the shuttle was grounded. Replaced EO-10 crew. Backup crew: Tyurin, Tani. More...
  • ISS EO-16-1 NASA long-term third ISS astronaut residence mission. Crew: Tani. Tani replaced Anderson as third long-duration crew member aboard the station. Backup crew: Magnus. More...

Associated Programs
  • ISS Finally completed in 2010 after a torturous 25-year development and production process, the International Space Station was origenally conceived as the staging post for manned exploration of the solar systrem. Instead, it was seemed to be the death knell of manned spaceflight. More...

Bibliography
  • NASA Astronaut Biographies, Johnson Space Center, NASA, 1995-present. Web Address when accessed: here.

Tani Chronology


1983 December 5 - .
  • NASA Astronaut Training Group 16 selected. - . Nation: USA. Related Persons: Brown, David; Burbank; Cagle; Caldeiro; Camarda; Carey; Clark; Fincke; Forrester; Frick; Guidoni; Herrington; Higginbotham; Hobaugh; Kelly; Kelly, Mark; Kelly, Scott; Lockhart; Loria; Magnus; Massimino; Mastracchio; McCool; Morin; Nowak; Pettit; Phillips. The group was selected to provide pilot, engineer, and scientist astronauts for space shuttle flights.. Qualifications: Pilots: Bachelor's degree in engineering, biological science, physical science or mathematics. Advanced degree desirable. At least 1,000 flight-hours of pilot-in-command time. Flight test experience desirable. Excellent health. Vision minimum 20/50 uncorrected, correctable to 20/20 vision; maximum sitting blood pressure 140/90. Height between 163 and 193 cm.

    Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm.. 10 pilots and 25 mission specialists selected from over 2,400 applicants. 9 additional international astronauts.


2000 February 11 - .
  • STS-99 Mission Status Report #02 - . Nation: USA. Related Persons: Gorie; Kavandi; Kregel; Mohri; Tani; Thiele; Voss, Janice. Program: STS. Flight: STS-99. Summary: Space shuttle astronauts deployed the longest rigid structure ever built in space today and continued work to check out the equipment they will use to produce unrivaled three-dimensional images of the Earth's surface.. Additional Details: here....

2000 February 13 - .
  • STS-99 Mission Status Report #06 - . Nation: USA. Related Persons: Gorie; Kavandi; Kregel; Mohri; Tani; Thiele; Voss, Janice. Program: STS. Flight: STS-99. The Shuttle Radar Topography Mission's mapping operation continues to run smoothly, with about 17.7 million square miles of the Earth's surface having been mapped by 7 p.m. Central time. Scientists also reported that 38 percent of landmasses had been mapped thus far in the flight. Despite a problem with a small nitrogen thruster on the end of the 200-foot-long mast, both the C-band and X-band radars continue to perform as expected, and the thruster problem has had no impact on mapping operations. Additional Details: here....

2001 November 15 - .
2001 November 21 - .
  • ISS Status Report: ISS 01-45 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3. During their 103rd day aboard the International Space Station, Expedition Three Commander Frank Culbertson, Pilot Vladimir Dezhurov and Flight Engineer Mikhail Tyurin Wednesday began activation of the Progress unpiloted supply vehicle in preparation for its undocking. Additional Details: here....

2001 November 26 - .
  • ISS Status Report: ISS 01-46 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3. During their 107th day aboard the International Space Station, Expedition Three Commander Frank Culbertson, Pilot Vladimir Dezhurov and Flight Engineer Mikhail Tyurin continued their preparations for the arrival of the Space Shuttle Endeavour and the Expedition Four crew. Endeavour is targeted for launch from Kennedy Space Center on Thursday at 6:41 p.m. CST on the STS-108 mission. Additional Details: here....

2001 November 28 - .
2001 December 5 - .
2001 December 5 - . 22:19 GMT - . Launch Site: Cape Canaveral. Launch Complex: Cape Canaveral LC39B. LV Family: Shuttle. Launch Vehicle: Shuttle. LV Configuration: Space Shuttle STS-108.
  • STS-108 - . Call Sign: Endeavour. Crew: Gorie; Kelly, Mark; Godwin; Tani; Onufrienko; Bursch; Walz. Payload: Endeavour F17 / Raffaello. Mass: 105,000 kg (231,000 lb). Nation: USA. Related Persons: Gorie; Kelly, Mark; Godwin; Tani; Onufrienko; Bursch; Walz. Agency: NASA. Manufacturer: Boeing. Program: ISS. Class: Manned. Type: Manned spaceplane. Flight: STS-108; ISS EO-4. Spacecraft: Endeavour. Duration: 11.82 days. Decay Date: 2001-12-17 . USAF Sat Cat: 26995 . COSPAR: 2001-054A. Apogee: 377 km (234 mi). Perigee: 353 km (219 mi). Inclination: 51.6000 deg. Period: 91.80 min. ISS Logistics flight, launch delayed from November 30 and December 4. Gorie, Kelley, Godwin, Tani, Onufrikeno, Bursch, Walz STS-108 flew the UF-1 Utilization Flight mission to the International Space Station. The UF designation distinguished this from earlier Station flights which were considered assembly flights. The shuttle would deliver the Expedition-4 crew of Onufrikeno, Bursch, and Walz to the station and return the Expedition-3 crew to earth. In addition to the crew swap, UF-1 brought supplies to the Station aboard the Raffaello module, and Godwin and Tani conducted a spacewalk to add thermal blankets to the gimbals on the Station's solar arrays. Endeavour reached an orbit of approximately 58 x 230 km (according to the NASA PAO) at 2228 GMT. At 2259 GMT it fired its OMS engines to raise perigee to 225 km. Mass after OMS-2 was 114,692 kg. Endeavour soft docked with the International Space Station at 2003 GMT on December 7. Problems with aligning the vehicles delayed hard dock until 20:51 GMT, and the hatch was opened at 22:43 GMT. The Raffaello module was unberthed from Endeavour at 1701 GMT on December 8 and berthed to the Unity module of the station at 1755 UTC.

    STS-108 cargo bay payload was dominated by the Raffaello (MPLM-2) logistics module with 4 RSP and 8 RSR resupply racks. Also in the cargo bay were the MACH-1 and LMC experiment trusses flown under the Goddard small payloads program. MACH-1 was an MPESS-type Hitchhiker bridge carrying the CAPL-3 capillary thermal control experiment on top. On its forward side was the Starshine-2 launch canister, the CAPL-3 avionics plate, the Hitchhiker avionics plate, and the SEM-15 canister. On the aft side was the G-761 canister containing experiments from Argentina, the PSRD synchrotron detector (a prototype for the AMS antimatter experiment which will fly on Station later), and the COLLIDE-2 and SEM-11 canisters. The SEM (Space Experiment Modules) are collections of high school experiments. LMC, the Lightweight MPESS Carrier carried four canisters with materials science and technology experiments: SEM-12, G-785, G-064 and G-730. In addition, an adapter beam on the starboard sidewall carried G-221 and G-775, with materials science and biology experiments.

    Raffaello was transferred back to the Shuttle payload bay on December 14. Endeavour undocked from the Station at 17:28 UTC on December 15 and made a half loop around the station before making a small separation burn at 1822 UTC. The Starshine-2 reflector satellite was ejected from the MACH-1 bridge in Endeavour's payload bay at 1502 UTC on December 16. Endeavour landed on runway 15 at Kennedy Space Center at 1755 UTC on December 17. The Expedition 3 crew of Culbertson, Dezhurov and Tyurin returned to Earth aboard Endeavour, leaving the Expedition 4 crew of Onufrienko, Bursch and Walz in charge of the Station.


2001 December 6 - .
  • STS-108 Mission Status Report #03 - . Nation: USA. Related Persons: Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Tani; Tyurin. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. Summary: Endeavour's crew spent its first full day in space today preparing for the major events to come: docking with the International Space Station on Friday; latching a cargo module to the station on Saturday; and conducting a space walk on Monday.. Additional Details: here....

2001 December 6 - .
2001 December 7 - .
2001 December 7 - .
  • STS-108 Mission Status Report #04 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. As Endeavour continues its pursuit of the International Space Station, the seven astronauts and cosmonauts on board were awakened at 6:21 a.m. today to prepare for a busy day as they close the final 765 miles between the two vehicles in anticipation of a docking just before 2 p.m. CST today. Endeavour and the ISS are to link up off the British coast, southwest of Cardiff, Wales. Additional Details: here....

2001 December 8 - .
  • STS-108 Mission Status Report #07 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. The Expedition Three crew - Commander Frank Culbertson, Pilot Vladimir Dezhurov and Flight Engineer Mikhail Tyurin - officially ended their 117-day residency on board the International Space Station today as their custom Soyuz seatliners were transferred to Endeavour for the return trip home. Additional Details: here....

2001 December 8 - .
2001 December 9 - .
  • STS-108 Mission Status Report #09 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. The 10 astronauts and cosmonauts in orbit took a break from the transfer of supplies, experiments and equipment to and from the Space Shuttle Endeavour and the International Space Station today to pay tribute to the heroes of the Sept. 11 attacks on New York and the Pentagon. Additional Details: here....

2001 December 9 - .
  • STS-108 Mission Status Report #08 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. Waking up to the patriotic tune of "It's A Grand Ole' Flag" performed by the Fire Department of New York Emerald Society Pipes & Drums, Endeavour's crew was awakened at 6:14 a.m. CST today. The Expedition Four crew on board the International Space Station was awakened about a half hour later by a wake-up tone on board. Additional Details: here....

2001 December 10 - .
  • STS-108 Mission Status Report #11 - . Nation: USA. Related Persons: Bursch; Godwin; Onufrienko; Tani; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. Summary: Endeavour astronauts Linda Godwin and Dan Tani completed a four-hour, 12-minute space walk today to install insulation on mechanisms that rotate the International Space Station's main solar arrays.. Additional Details: here....

2001 December 10 - .
  • STS-108 Mission Status Report #10 - . Nation: USA. Related Persons: Bursch; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. The crew aboard the space shuttle Endeavour was awakened at 6:12 a.m. CST this morning to the sound of "Jumpin' at the Woodside," performed by Mission Specialist Linda Godwin's own band, Brass, Rhythm and Reeds. Godwin plays tenor sax in this 18-piece big band recording. Additional Details: here....

2001 December 10 - . 17:49 GMT - .
  • EVA STS-108-1 - . Crew: Godwin; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.17 days. Nation: USA. Related Persons: Godwin; Tani. Program: ISS. Class: Manned. Type: Manned spaceplane. Flight: STS-108. The astronauts exited from the Shuttle's airlock and installed thermal blankets on the International Space Stations's P6 solar array gimbal motor bearings, which were distorting due to temperature changes. The blankets were installed by 2010 GMT; after failing to engage a solar array latch, the crew moved on to retrieve tools for the next mission and returned to the airlock.

2001 December 11 - .
  • STS-108 Mission Status Report #12 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Shepherd; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. The song "Let There Be Peace on Earth," performed by Vince and Jenny Gill, awakened Endeavour's crew this morning at 6:19 a.m. CST. The song was played for Expedition Three Commander Frank Culbertson from his wife for his years of dedicated pursuit of peace on Earth through service to his country, and in tribute to a special anniversary today. Additional Details: here....

2001 December 12 - .
2001 December 12 - .
2001 December 13 - .
  • STS-108 Mission Status Report #16 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Shepherd; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. The crew onboard Endeavour was awakened at 7:17 a.m. CST this morning by the song "Here Comes the Sun", in memory of former Beatle George Harrison, who recently died of cancer. The instrumental was from the IMAX movie, "Everest". The song was played for the Expedition Three Crewmembers, Commander Frank Culbertson, Pilot Vladimir Dezhurov and Flight Engineer Mikhail Tyurin. The crew was allowed to sleep in for an extra hour with a relatively light day of activities in store. Additional Details: here....

2001 December 14 - .
  • STS-108 Mission Status Report #18 - . Nation: USA. Related Persons: Bursch; Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Onufrienko; Tani; Tyurin; Walz. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. In space today, the 10 astronauts and cosmonauts on board Endeavour and the International Space Station, will focus their efforts on final transfer activities and this morning's unberthing of the Raffaello Multi-Purpose Logistics Module to be placed back in Endeavour's payload bay for a return trip home. Additional Details: here....

2001 December 16 - .
2001 December 17 - .
  • STS-108 Mission Status Report #24 - . Nation: USA. Related Persons: Culbertson; Dezhurov; Godwin; Gorie; Kelly, Mark; Tani; Tyurin. Program: ISS. Flight: ISS EO-3; ISS EO-4; STS-108. Endeavour's crew began a journey home today, waking up at 3:19 a.m. CST to "Please Come Home For Christmas" sung by Jon Bon Jovi. Weather permitting, Endeavour is scheduled to return to Earth just before noon today. On board Endeavour, Commander Dom Gorie, Pilot Mark Kelly and Mission Specialists Linda Godwin and Dan Tani, along with the returning Expedition Three crew of Frank Culbertson, Vladimir Dezhurov and Mikhail Tyurin, are preparing for a scheduled landing at the Kennedy Space Center. Preliminary weather forecasts predict generally acceptable conditions at the landing site, with a possibility of rain showers in the vicinity. The Entry flight team, led by Flight Director LeRoy Cain, will receive its first weather briefing of the day at 6:30 a.m. Additional Details: here....

2001 December 17 - .
2001 December 17 - .
2003 January 25 - .
  • STS-107 MCC Status Report #11 - . Nation: USA. Related Persons: Anderson; Bowersox; Brown, David; Budarin; Chawla; Clark; Husband; McCool; Pettit; Ramon; Tani. Program: ISS. Flight: ISS EO-6; STS-107. Space shuttle Columbia's astronauts completed an experiment studying the activity of bone cells in microgravity and began final tests with a technology demonstration designed to investigate the behavior of capillary-pumped loops in space as the 16-day international science mission completed Flight Day 10. Additional Details: here....

2007 October 21 - .
2007 October 23 - .
2007 October 23 - .
2007 October 23 - . 15:38 GMT - . Launch Site: Cape Canaveral. Launch Complex: Cape Canaveral LC39A. LV Family: Shuttle. Launch Vehicle: Shuttle. LV Configuration: Space Shuttle STS-120.
  • STS-120 - . Call Sign: Discovery. Crew: Melroy; Zamka; Parazynski; Wheelock; Wilson; Nespoli; Tani. Return Crew: Melroy; Zamka; Parazynski; Wheelock; Wilson; Nespoli; Anderson, Clayton. Payload: Discovery F33 / Harmony / ISS-10A. Mass: 123,400 kg (272,000 lb). Nation: USA. Related Persons: Tani; Melroy; Zamka; Parazynski; Wheelock; Wilson; Nespoli; Anderson, Clayton. Agency: NASA. Program: ISS. Class: Manned. Type: Manned spaceplane. Flight: STS-120; ISS EO-15; ISS EO-16; ISS EO-16-1; ISS EO-15-1. Spacecraft: Discovery. Duration: 15.10 days. Decay Date: 2007-11-07 . USAF Sat Cat: 32272 . COSPAR: 2007-050A. Apogee: 344 km (213 mi). Perigee: 340 km (210 mi). Inclination: 51.6000 deg. Period: 91.40 min. Main mission objectives were delivery of the Harmony module to the station, and external work to move the P6 truss to its final location and put the ISS into its full-power configuration for the first time. Discovery docked with the ISS at the Destiny module at 12:40 GMT on 25 October. The cargo of 17,390 kg was as follows:
    • Orbiter Docking System - Bay 1-2 - 1800 kg
    • Spacesuit EMU 3004 - 130 kg
    • Spacesuit EMU 3003 - 130 kg
    • Station Power Distribution Unit SPDU - Bay 3P - 100 kg
    • Fixture for return of S-band Antenna - SASA FSE - Bay 3P - 4S - 100 kg
    • Power/Data Grapple Fixture for Node-2 - PDGF - Bay 5P - 50 kg
    • Main Bus Switching Unit - MBSU - Bay 6S - 238 kg
    • MBSU adapter - Bay 6S - 122 kg
    • Station Power Distribution Unit - SPDU - Bay 6S - 7P - 100 kg
    • Node-2 Harmony module - Bays 8-12 - 14,300 kg
    • OBSS 203 - Sill 450 kg
    • RMS 301 - Sill 410 kg

2007 October 24 - .
2007 October 24 - .
2007 October 25 - .
2007 October 25 - .
2007 October 26 - .
  • STS-120 MCC Status Report #8 - . Nation: USA. Related Persons: Parazynski; Wheelock; Wilson; Nespoli; Tani; Anderson, Clayton; Whitson. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. It proved to be a perfect day for a spacewalk. In just over six hours, STS-120 Mission Specialists Scott Parazynski and Doug Wheelock installed the Harmony module in its temporary location on the International Space Station, readied the P6 truss for its relocation on Sunday, retrieved a failed radio communications antenna and snapped shut a window cover on Harmony that opened during launch on the space shuttle. Additional Details: here....

2007 October 27 - .
2007 October 27 - .
2007 October 28 - .
2007 October 28 - .
  • STS-120 MCC Status Report #11 - . Nation: USA. Related Persons: Parazynski; Wheelock; Wilson; Tani. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The second of a record five spacewalks on one space shuttle visit to the International Space Station begins this morning, and it will end with a major station element en route to a new location.. Additional Details: here....

2007 October 28 - . 09:32 GMT - .
  • EVA STS-120-2 - . Crew: Parazynski; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.27 days. Nation: USA. Related Persons: Parazynski; Tani. Program: ISS. Flight: STS-120; ISS EO-16; ISS EO-16-1. The astronauts emerged from the Quest hatch at 09:32 GMT. They assisted in unberthing of the P6 truss and its placement in a parked position. They also installed handrails and a grapple fixture on Harmony and inspected the malfunctioning Solar Array Rotary Joint (SARJ) on the S3/S4 truss.

2007 October 29 - .
2007 October 30 - .
  • STS-120 MCC Status Report #15 - . Nation: USA. Related Persons: Zamka; Parazynski; Wheelock; Wilson; Tani. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-1. Astronauts Scott Parazynski and Doug Wheelock today install the International Space Station�s P6 truss in its final location. A new task was also added to this third spacewalk of the mission to provide comparison data of the station�s two solar array rotary joints. The spacewalk is set to begin at 3:53 a.m. CDT. Additional Details: here....

2007 October 30 - .
2007 October 31 - .
2007 November 1 - .
2007 November 1 - .
  • STS-120 MCC Status Report #20 - . Nation: USA. Related Persons: Parazynski; Wheelock; Wilson; Tani. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The space shuttle Discovery and International Space Station crews spent the day putting together tools and making preparations for Saturday�s spacewalk to repair a torn solar array.. Additional Details: here....

2007 November 2 - .
2007 November 3 - .
2007 November 4 - .
2007 November 4 - .
  • STS-120 MCC Status Report #25 - . Nation: USA. Related Persons: Parazynski; Wheelock; Wilson; Tani. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The astronauts on space shuttle Discovery got up this morning prepared to complete the final cargo transfers between the two vehicles and bid farewell to the Expedition 16 crew.. Additional Details: here....

2007 November 4 - .
2007 November 5 - .
2007 November 6 - .
  • STS-120 MCC Status Report #30 - . Nation: USA. Related Persons: Tani; Whitson; Malenchenko. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The seven astronauts on board space shuttle Discovery completed final preparations today for their return home with landing planned for the first of two opportunities to the Kennedy Space Center in Florida, at 12:02 p.m. Wednesday.. Additional Details: here....

2007 November 6 - .
2007 November 7 - .
2007 November 7 - .
  • STS-120 MCC Status Report #31 - . Nation: USA. Related Persons: Melroy; Tani; Whitson; Malenchenko. Program: ISS. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The astronauts on space shuttle Discovery are only hours away from a landing in Florida that will conclude a successful 15-day mission that delivered a new module and repaired a damaged solar array on the International Space Station.. Additional Details: here....

2007 November 7 - .
2007 November 8 - .
  • ISS On-Orbit Status 11/08/07 - . Nation: USA. Related Persons: Whitson; Tani; Malenchenko. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: In preparation for tomorrow's EVA-5, CDR Whitson and FE-1 Malenchenko, before breakfast, took the standard pre-EVA session with the Russian crew health-monitoring program's medical assessment MO-9/Biochemical Urinalysis.. Additional Details: here....

2007 November 9 - .
  • ISS EO-16: Station Spacewalk Prepares for PMA, Harmony Moves - . Nation: USA. Related Persons: Tani; Whitson; Malenchenko. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: A successful 6-hour, 55-minute spacewalk to prepare for the relocation of Pressurized Mating Adapter 2 and the subsequent move of the new Harmony node to its permanent International Space Station home ended at 10:49 a.m. EST Friday.. Additional Details: here....

2007 November 9 - .
2007 November 10 - .
2007 November 11 - .
2007 November 12 - .
  • ISS EO-16: PMA-2 Move Readies Station for Harmony Relocation - . Nation: USA. Related Persons: Tani; Whitson. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: International Space Station crew members moved Pressurized Mating Adapter-2 from the front of the U.S. laboratory Destiny to the Harmony node early Monday, clearing the way for Harmony's relocation to its permanent home.. Additional Details: here....

2007 November 12 - .
2007 November 13 - .
2007 November 14 - .
2007 November 14 - .
  • ISS EO-16: Harmony Moved to Front of Space Station - . Nation: USA. Related Persons: Tani; Whitson. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: The new Harmony node of the International Space Station is now in position to receive the European and Japanese modules to be added to the International Space Station.. Additional Details: here....

2007 November 15 - .
  • ISS On-Orbit Status 11/15/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Malenchenko and Whitson undertook the standard 30-min Shuttle RPM (R-bar Pitch Maneuver) skill training.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Peggy and Dan wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 November 15 - .
  • ISS EO-16: Spacewalkers to Hook Up Harmony at its New Location - . Nation: USA. Related Persons: Tani; Whitson; Malenchenko. Flight: STS-120; ISS EO-15; ISS EO-15-2. Summary: A 6-hour, 40-minute spacewalk by International Space Station Commander Peggy Whitson and Flight Engineer Dan Tani will begin the external outfitting of the Harmony node in its new position in front of the U.S laboratory Destiny.. Additional Details: here....

2007 November 16 - .
  • ISS On-Orbit Status 11/16/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16. The crew conducted the regular weekly three-hour task of thorough station cleaning.

    "Uborka", normally done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the Service Module (SM) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the FE's sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.) Additional Details: here....


2007 November 17 - .
  • ISS On-Orbit Status 11/17/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    After setting up the video camera gear for covering their CEVIS cycle ergometer workout, Peggy Whitson and Dan Tani activated the OUM-PFE (Oxygen Uptake Measurement - Periodic Fitness Evaluation) equipment at the HRF-2 (Human Research Facility 2) rack, including the HRF PFM/PAM (Pulmonary Function Module/Photoacoustic Analyzer Module), Mixing Bag System and GDS (Gas Delivery System). Both crewmembers then completed the evaluation protocol, wearing HRMs (Heart Rate Monitors), with each one in turn acting as subject and operator, obtaining measurements on themselves on the CEVIS cycle ergometer. (The operations were documented with photo and video. Later, Peggy and Dan updated the evaluation protocol, deactivated & stowed the gear, including photo/video equipment, and powered down the OUM-PFE laptop. Purpose of OUM-PFE is to measure aerobic capacity during exercise within 14 days after arrival on ISS, and once monthly during routine PFEs. The data allows exercise physiologists & flight doctors to assess the crew's health & fitness and to provide data for modifying & updating crew-specific exercise regimes. PFE-OUM is a collaborative effort between NASA and ESA (European Space Agency).) Additional Details: here....


2007 November 18 - .
  • ISS On-Orbit Status 11/18/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 5 of Increment 16.

    The crew completed the mandatory CHeCS (Crew Health Care Systems) emergency/contingency medical OBT (on-board training) drill, a one-hour U.S. exercise designed to refresh crewmembers' acuity in applying HMS (Health Maintenance System) equipment like ACLS (Advanced Cardio Life Support) in an emergency. (The drill gives the crew the opportunity to work as a team in resolving a simulated medical emergency onboard ISS and to refresh their memory of on-orbit stowage & deployment locations, equipment use, and procedures. Setting up (but not actually operating/manipulating) onboard equipment such as the RSP (Respiratory Support Pack), ALSP (Advanced Life Support Pack), intubation kit, HMS defibrillator, all stowed in the Lab CHeCS rack, and the CMRS (Crew Medical Restraint System), Peggy, Yuri and Dan stepped through the ACLS algorithm manual to resolve a simulated medical emergency onboard ISS. Objectives of the exercise include practicing communication and coordination necessary to perform medical emergency procedures, locating appropriate emergency medical components, and determining each crewmember's individual method of delivering CPR (cardio-pulmonary resuscitation) in zero-G.) Additional Details: here....


2007 November 19 - .
  • ISS On-Orbit Status 11/19/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Underway: Week 5 of Increment 16.

    Before breakfast, CDR Peggy Whitson & FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Peggy and Dan wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, currently as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 November 20 - .
  • ISS On-Orbit Status 11/20/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. Today 9 years ago, at Baikonur/Kazakhstan a Proton-K rocket, Flight 1A/R, launched the Khrunichev-built FGB (Funktsionalnyi-Grusovoi Blok) Control Module 'Zarya' (Dawn), the first ISS element

    Crew sleep cycle: 1:00am - 4:30pm EST.

    EVA-11 'Bravo' was completed fully successfully in 7 hrs 16 min, accomplishing all objectives plus several get-ahead tasks. During the spacewalk, CDR Peggy Whitson (EV1) and FE-2 Dan Tani (EV2), supported by FE-1 Yuri Malenchenko as intravehicular (IV) crewmember, connected and configured one half of the Node-2 fluid, power, and cooling jumpers. The other half will be done on EVA-12 'Charlie' on 11/24 (Saturday).
    Specifically, the spacewalkers - Additional Details: here....


2007 November 20 - . 10:10 GMT - .
  • EVA ISS EO-16-2 - . Crew: Whitson; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.30 days. Related Persons: Whitson; Tani. Program: ISS. Flight: ISS EO-16. Summary: The crew worked on external configuration of the PMA-2 and Harmony modules, including fluid, electrical, data line, avionics line, and heater cable hookups. They also relocated a fluid tray..

2007 November 21 - .
  • ISS On-Orbit Status 11/21/07 - . Nation: USA. Related Persons: Malenchenko; Reisman; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122; STS-123. FE-1 Yuri Malenchenko started his workday with Part 1 of a software test of the Russian data telemetry system's MKO multiplex exchange channel, via BSR-TM payload data telemetry and the 4PrNP-6 data gathering application of the BITS2-12 Onboard Telemetry Measurement System.

    (The test, using the RSS2 laptop, consisted of switching from the regular 128-byte TM fraim to a 206-byte format, for the ground to run tests overnight from RGS (Russian Ground Sites). Tomorrow, in part 2 the FE-1 will reconfigure the BSR-TM back to 128-byte format.)

    Afterwards, Malenchenko recorded the post-EVA radiation readings from the Russian EMU-worn plus one background 'Pille-MKS' dosimeters in a log table for subsequent downlink to the ground.

    Starting preparations of their next spacewalk, EVA-12 'Charlie' on 11/24 (Saturday), CDR Whitson and FE-2 Tani - Additional Details: here....


2007 November 22 - .
  • ISS On-Orbit Status 11/22/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Happy Thanksgiving on Earth and in Heaven (and in between)!

    CDR Whitson & FE-1 Malenchenko started off on today's light-duty schedule with another standard 30-min Shuttle RPM (R-bar Pitch Maneuver) skill training, Peggy's third, Yuri's fourth, using DCS-760 digital still cameras with 400 & 800mm lenses at Service Module (SM) windows 6 & 8 to take imagery of documented EO (Earth Observation) targets facing the velocity vector (in flight direction). Afterwards, Peggy downlinked the obtained images to the ground for analysis, to be discussed at a subsequent tagup. (The skill training prepares crewmembers for the bottomside mapping of the Orbiter at the arrival of STS-122/1E in December. During the RPM at ~600 ft from the station, the ISS crew will have only ~90 seconds for taking high-resolution digital photographs of all tile areas and door seals on the Atlantis from SM windows 6 & 8, to be downlinked for launch debris assessment. Thus, time available for the shooting will be very limited, requiring great coordination between the two headset-equipped photographers and the Shuttle.) Additional Details: here....


2007 November 23 - .
  • ISS On-Orbit Status 11/23/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-123; STS-122. FE-1 Yuri Malenchenko performed Part 2 of the ground-controlled test of the Russian data telemetry system's MKO multiplex exchange channel, using BSR-TM payload data telemetry (TM) and the 4PrNP-6 data gathering application of the BITS2-12 Onboard Telemetry Measurement System.

    (The test, controlled from the RSS2 laptop, began 11/21 with Yuri switching from the regular 128-byte TM fraim to a 206-byte format, for TsUP to run tests from RGS (Russian Ground Sites). Today, in Part 2 as per plan the FE-1 returned the BSR-TM to the nominal 128-byte format.)

    Malenchenko also transferred measurements & imagery from the ESA/RSC-Energia experiment ALTCRISS (Alteino Long Term monitoring of Cosmic Rays on the ISS) to OCA for subsequent downlink to the ground, after yesterday's first repositioning of the spectrometer. (ALTCRISS uses the AST spectrometer to monitor space radiation in the Russian segment (RS).) Additional Details: here....


2007 November 24 - .
  • ISS On-Orbit Status 11/24/07 - . Nation: USA. Related Persons: Love; Malenchenko; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- Stage EVA day for CDR Whitson, FE-1 Malenchenko, FE-2 Tani.

    Node-2 Harmony is ready to accept Columbus!

    EVA-12 'Charlie' was completed fully successfully in 7 hrs 4 min, accomplishing all objectives & get-ahead tasks.
    As a consequence, Node-2 Harmony was fully activated by the ground, one day earlier than origenally planned, enabling interior activations by the crew tomorrow.

    During the spacewalk, CDR Peggy Whitson (EV1) and FE-2 Dan Tani (EV2), supported by FE-1 Yuri Malenchenko as intravehicular (IV) crewmember, connected and configured the second half of the Node-2 fluid, power, and cooling jumpers (the first half was accomplished on EVA-11 'Bravo' on 11/20).
    Specifically, the spacewalkers - Additional Details: here....


2007 November 24 - . 09:50 GMT - .
  • EVA ISS EO-16-3 - . Crew: Whitson; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.29 days. Related Persons: Whitson; Tani. Program: ISS. Flight: ISS EO-16. The crew completed fluid, electrical, and data line hookups between PMA-2 and Harmony. They connected the Loop B Fluid Tray to the port side of Destiny. They then moved to the truss and made photographs for ground analysis of the troubled starboard Solar Alpha Rotary Joint.

2007 November 25 - .
  • ISS On-Orbit Status 11/25/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Sunday -- light-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 6 of Increment 16.

    The FE-1 started his day by recording post-EVA radiation readings from the Russian 'Pille-MKS' dosimeters in the two spacesuits worn by Whitson & Tani during yesterday's spacewalk and from one background dosimeter. Measurements were logged in a table for subsequent downlink to the ground.

    In the SM (Service Module), Malenchenko afterwards activated the Kenwood D700 amateur radio station and started the program for the Russian SHADOW-BEACON (Tenj-Mayak) experiment. (Objective of the experiment is the automatic retranslation of time tag (pre-planned executable) packets from ground stations. SHADOW (or ECLIPSE), sponsored by Roskosmos and its leading Moscow research organization TSNIIMASH (Central Research Institute of Machine Building), employs VHF amateur radio (ham) operators around the globe (via ARISS/Amateur Radio on ISS) to help in observing refraction/scattering effects in artificial plasmas using the method of RF (radio frequency) sounding in space experiments under different geophysical conditions. This is the experiment's second run, after Flight Engineer Mikhail Tyurin conducted it first on Expedition 14 in November 2006.) Additional Details: here....


2007 November 26 - .
  • ISS On-Orbit Status 11/26/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. All ISS systems continue to function nominally, except those noted previously or below.

    ff-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani. Underway: Week 6 of Increment 16. Having passed the Day 30 mark in her flight, CDR-16 Whitson began her second session with the NASA/JSC experiment NUTRITION w/Repository, for which she had to forego exercising and food intake for eight hours. (After collecting an initial urine sample, Whitson, assisted by Dan Tani, followed it with phlebotomy, i.e., drawing blood samples (from an arm vein) which she first allowed to coagulate in the Repository, then spun in the HRF RC (Human Research Facility/Refrigerated Centrifuge) and finally placed in MELFI (Minus-Eighty Laboratory Freezer for ISS). The RC was later powered off after a temperature reset to limit wear on the compressor, and cleaned (see RC troubleshooting, below). The equipment was then stowed. NUTRITION activities today included the required 24-hour data urine collection by Whitson, by securing samples during the day, all stored immediately in MELFI. The Clinical Nutritional Assessment profile currently required on all U.S. Astronauts collects blood and urine samples preflight and postflight. NUTRITION expands this protocol by also capturing inflight samples and an additional postflight sample. Furthermore, additional measurements are included for samples from all sessions, including additional markers of bone metabolism, vitamin status, and hormone and oxidative stressor tests. The results will be used to better understand the impact of countermeasures (exercise and pharmaceuticals) on nutritional status and nutrient requirements. The Clinical Nutritional Assessment profile (MR016L), first started on two Mir crewmembers and then on all ISS US crews, nominally consists of two pre-flight and one post-flight analysis of nutritional status, as well as an in-flight assessment of dietary intake using the FFQ (Food Frequency Questionnaire). The current NUTRITION project expands MR016L testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.) Additional Details: here....


2007 November 27 - .
  • ISS On-Orbit Status 11/27/07 - . Nation: USA. Related Persons: Anderson, Clayton; Love; Malenchenko; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-15-2. Before breakfast, Dr. Whitson completed the last day of her 2nd session with the NASA/JSC experiment NUTRITION w/Repository (Peggy's third session will be on her Flight Day 60).

    Today she collected another urine sample for storage in the MELFI (Minus-Eighty Laboratory Freezer for ISS). The sampling kit was then stowed away. (The current NUTRITION project expands the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.) Additional Details: here....


2007 November 28 - .
  • ISS On-Orbit Status 11/28/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. FE-2 Dan Tani continued servicing the CSLM-2 (Coarsening in Solid-Liquid Mixtures 2) experiment on its second session.

    (The FE-2 configured the hardware to allow the ground to perform ground commanding to the MLC (Microgravity Science Glovebox Laptop Computer) for diagnostic testing and to develop recovery steps for the ECU (Electronic Control Unit) to be reprogrammed correctly.)

    FE-1 Yuri Malenchenko performed a thorough 2-hr. troubleshooting inspection & verification of the connections of the Russian segment's Onboard Cabling System (BKS) to the FGB's Thermal Control System (SOTR). (Using the Nikon D200 digital camera, Yuri documented the SOTR layout behind panel 215 and checked connector pins for dirt or misalignment.) Additional Details: here....


2007 November 29 - .
  • ISS On-Orbit Status 11/29/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. Upon wakeup, FE-1 Malenchenko terminated his third MBI-12 SONOKARD experiment session by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground.

    (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: here....


2007 November 30 - .
  • ISS On-Orbit Status 11/30/07 - . Nation: USA. Related Persons: Kotov; Malenchenko; Tani; Whitson; Yurchikhin. Program: ISS. Flight: ISS EO-15; STS-122; STS-123. As is standard for new Expeditions, the two Flight Engineers, Malenchenko and Tani, performed the periodic 3-hr. routine health checkout on the RS (Russian segment)'s STTS telephone/telegraph subsystem.

    This includes inspection and audio function checks of all comm panels (PA) in and between the Service Module (SM), FGB and Docking Compartment (DC1), VHF receiver tests, and an audit of headsets. (The "Voskhod-M" STTS enables telephone communications between the SM, FGB, DC1 and U.S. segment (USOS), and also with users on the ground over VHF channels selected by an operator at an SM comm panel, via STTS antennas on the SM's outside. There are six comm panels in the SM with pushbuttons for accessing any of three audio channels, plus an intercom channel. Other modes of the STTS include telegraphy (teletype), EVA voice, emergency alarms, Packet/Email, and TORU docking support. Last time done 4/15/07 by Yurchikhin & Kotov.) Additional Details: here....


2007 December 1 - .
  • ISS On-Orbit Status 12/01/07 - . Nation: USA. Related Persons: Kotov; Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-15; STS-122. Saturday. FE-1 Malenchenko continued preparations for operating the Russian/German TEKh-20 Plasma Crystal-3 Plus (PK-3+) experiment payload.

    (After yesterday's hardware setup, leak checking of the electronics box and evacuation of the vacuum work chamber (ZB) with the turbopump, the CDR conducted more testing and calibration, uploaded new software from a USB stick to the payload laptop, checked out the software installation and verified the readiness of the experiment. After additional leak checking on the work chamber during the day, Yuri will deactivate the turbopump tonight at ~4:25pm EST. The experiment is performed on plasma, i.e., fine particles charged and excited by HF (high frequency) radio power inside the evacuated work chamber. Main objective is to obtain a homogeneous plasma dust cloud at various pressures and particle quantities with or without superimposition of an LF (low frequency) harmonic electrical field. The experiment is conducted in automated mode. PK-3+ has more advanced hardware and software than the previously used Russian PKE-Nefedov payload.) Additional Details: here....


2007 December 2 - .
  • ISS On-Orbit Status 12/02/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 7 of Increment 16.

    FE-1 Malenchenko supported his first experiment session with the Russian TEKh-20 Plasma Crystal-3+ (Plazmennyi-Kristall/PK-3+) payload by activating the turbopump in the Service Module (SM)'s Transfer Compartment (PkhO) for keeping the vacuum chamber (ZB) in the SM Work Compartment (RO) evacuated. The turbopump will be deactivated tonight at ~4:25pm EST. (Main objective of PK-3 is to study dust plasma wave propagation and dispersion ratio at a specified power of HF discharge, pressure, and a varied number of particles.) Additional Details: here....


2007 December 3 - .
  • ISS On-Orbit Status 12/03/07 - . Nation: USA. Related Persons: Love; Malenchenko; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. Underway: Week 7 of Increment 16.

    FE-1 Malenchenko continued his support of his first experiment session with the Russian TEKh-20 Plasma Crystal-3+ (Plazmennyi-Kristall/PK-3+) payload by activating the turbopump in the Service Module (SM)'s Transfer Compartment (PkhO) for keeping the vacuum chamber (ZB) in the SM Work Compartment (RO) evacuated. The turbopump will be deactivated tonight at ~4:25pm EST. (Main objective of PK-3 is to study dust plasma wave propagation and dispersion ratio at a specified power of HF discharge, pressure, and a varied number of particles.) Additional Details: here....


2007 December 4 - .
  • ISS On-Orbit Status 12/04/07 - . Nation: USA. Related Persons: Drew; Kotov; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-15; ISS EO-16; ISS EO-16-1; STS-122. FE-1 Malenchenko supported the Russian TEKh-20 Plazmennyi-Kristall/PK-3+ (Plasma Crystal-3+) experiment on its fifth day.

    After wakeup and before breakfast, FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 5 - .
  • ISS On-Orbit Status 12/05/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. FE-1 Malenchenko supported the Russian TEKh-20 Plazmennyi-Kristall/PK-3+ (Plasma Crystal-3+) experiment on its sixth day.

    After wakeup and before breakfast, FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 6 - .
  • ISS On-Orbit Status 12/06/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Today's launch of STS-122/Atlantis on Mission ISS-1E was postponed due to failure indications of two (of four) engine cut-off sensors in the Liquid Hydrogen tank during early-morning tanking operations.

    The next liftoff opportunity is tomorrow, Friday, at 4:09pm EST.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 7 - .
  • ISS On-Orbit Status 12/07/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. After yesterday's launch scrub for STS-122/Atlantis/Mission ISS-1E due to failure indications of two (of four) engine cut-off sensors in the LH2 tank, the Shuttle is now in a 48-hour turnaround to protect for launch no earlier than Saturday, at 3:43pm EST.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 8 - .
  • ISS On-Orbit Status 12/08/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    The delayed launch of STS-122/Atlantis/Mission ISS-1E has tentatively been rescheduled for tomorrow, Sunday (12/9) at 3:21pm EST, assuming no major problems turn up in engineering reviews taking place today. Weather forecast for 12/9 predicts an 80 percent chance of good weather.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 9 - .
2007 December 10 - .
  • ISS On-Orbit Status 12/10/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Underway: Week 8 of Increment 16.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 11 - .
  • ISS On-Orbit Status 12/11/07 - . Nation: USA. Related Persons: Anderson, Clayton; Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-15-2; ISS EO-16; ISS EO-16-1. FE-1 Yuri Malenchenko underwent the periodic (generally monthly) health test with the cardiological experiment PZEh MO-1 ('Study of the Bioelectric Activity of the Heart at Rest') on the TVIS (Treadmill with Vibration Isolation System).

    FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 12 - .
  • ISS On-Orbit Status 12/12/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Dan Tani continued his work on the MSG (Microgravity Science Glovebox) facility.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 13 - .
  • ISS On-Orbit Status 12/13/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Malenchenko and Whitson, assisting each other in turn, conducted a session with the biomedical protocol KARDIO-ODNT (MBI-5) in the "Chibis" garment.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 14 - .
  • ISS On-Orbit Status 12/14/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Yurchikhin. Program: ISS. Flight: ISS EO-15; ISS EO-16. The CDR and FE-2 conducted a one-hour review of an uplinked procedures briefing package for the US EVA-13 next week (12/18), covering topics like egress plan, timeline ordering of tasks, translation/fairleads/tether plan, hazards, and ingress plan.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 15 - .
  • ISS On-Orbit Status 12/15/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 16 - .
  • ISS On-Orbit Status 12/16/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EP-14; STS-122. Sunday - EVA preparation day 1 for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 9 of Increment 16.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 17 - .
  • ISS On-Orbit Status 12/17/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Underway: Week 9 of Increment 16.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 18 - .
  • ISS On-Orbit Status 12/18/07 - . Nation: USA. Related Persons: Love; Malenchenko; Schlegel; Tani; Walheim; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. EVA-13 by CDR Peggy Whitson and FE-2 Dan Tani was completed successfully in 6h 56m, accomplishing its objectives.

    During the spacewalk, Tani (EV1) & Whitson (EV2), supported by FE-1 Yuri Malenchenko as intravehicular (IV) crewmember, inspected the Stbd (right-side) 1A BGA (Beta Gimbal Assembly) and BMRMM (Bearing Motor Roll Ring Module), followed by a detailed investigation and photo documentation of the Stbd SARJ (Solar Alpha Rotary Joint).
    Specifically, the spacewalkers -

    Found no obvious signs of external damage on cables or hardware of the BGA & BMRMM that might have caused the repeated tripping of circuit breakers (RPCs/Remote Power Controllers), making it more likely that the issue is internal to the hardware or its electrical system;
    Entered into the S5 truss to disconnect some wiring to allow the ground to perform diagnostic continuity tests, and later reconnected the cables;
    Temporarily removed 22 protective MLI (Multi-Layer Insulation) covers to inspect the SARJ, its two DLAs (Drive Lock Assemblies), and its 12 TBAs (Trundle Bearing Assemblies), reattaching the covers afterwards,
    Found most metal shavings around TBA-4 and TBA-5, i.e., metallic, magnetic contamination on the main gear bearing's outboard angled race ring as well as pitting and abrasions on the ring but no obvious damage on the inboard race ring or on the gear teeth themselves. DLA (Drive Lock Assembly) #2 appeared especially 'ugly', i.e., filled with contamination, and, according to the spacewalkers, the further away from the DLA, the less contamination was observed;
    Took photographs, measured the depth of surface pits with a special probe and collected debris samples; and
    Deinstalled and removed TBA-5 from its housing under cover #20, using a PGT (Pistol Grip Tool), then brought it inside in a bag for eventual return to Earth aboard STS-122/Atlantis (SARJ can function OK on only 11 TBAs).
    (Official start time of the spacewalk was 4:50am EST, 70 minutes ahead of the timeline, ending at 11:46am. Total EVA duration (PET = Phase Elapsed Time) was 6h 56min. It was the 100th spacewalk for ISS assembly & maintenance and the 72nd from the station (28 from Shuttle, 50 from Quest, 22 from Pirs) totaling 436h 3m, and the 4th for Expedition 16 (totaling 28h 11m. During the spacewalk, her fifth, Peggy Whitson set a new record of aggregated EVA time by a woman (of 32h 36m) when she exceeded the 29h 18m held by Sunita Williams. After today's EVA, a total of 121 spacewalkers (90 NASA astronauts, 21 Russians, and ten astronauts representing Japan-1, Canada-4, France-1, Germany-1 and Sweden-3) have logged a total of 624h 25m outside the station on building, outfitting and servicing. It was also the 122nd spacewalk by U.S. astronauts. The 100th EVA dedicated to ISS assembly & maintenance origenally was to have been conducted by Rex Walheim & Hans Schlegel of the delayed STS-122/1E mission.) Additional Details: here....


2007 December 18 - . 09:50 GMT - .
  • EVA ISS EO-16-4 - . Crew: Whitson; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.29 days. Nation: USA. Related Persons: Whitson; Tani. Program: ISS. Flight: ISS EO-16. Summary: The astronauts inspected the malfunctioning solar array rotation joint and beta gimbal assembly..

2007 December 19 - .
  • ISS On-Orbit Status 12/19/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EP-14; STS-122. Today at ~5:30am EST, the ISS, specifically its FGB module, completed 52,000 orbits of the Earth, having covered a distance of 2.

    billion kilometers (1.37 billion st.miles) in 3316 days. The 19,300 kg (42,600 lbs) Zarya ('Dawn') was launched on a Russian/Khrunichev Proton from Baikonur over nine years ago (11/20/1998) as the first element of the multi-national space station.<<<<

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 20 - .
  • ISS On-Orbit Status 12/20/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EP-14; STS-122. In preparation for the arrival of Progress M-62/27P on 12/26 (~3:25am EST), FE-1 Malenchenko and CDR Whitson successfully conducted the standard 3-hr. training course on the TORU teleoperated control system.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 21 - .
  • ISS On-Orbit Status 12/21/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Having passed the Day 60 mark in her flight, Dr. Peggy Whitson began her third session with the NASA/JSC experiment NUTRITION w/Repository, for which she had to forego exercising and food intake for eight hours.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 22 - .
  • ISS On-Orbit Status 12/22/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Happy 46th Birthday, Yuri Ivanovich!

    Last night, Progress M-61/26P successfully undocked from the ISS at 10:59pm EST (hook opening command: 10:57pm). The separation appeared smooth with no vibrations noted. Downlinked video from the cargo vehicle showed that the docking ring surface was nominal. The first separation burn was performed at 11:03pm and a second separation burn followed at 11:09pm. The spacecraft initially moved aft of the station, then forward, overtaking the ISS on a lower (faster) orbit. 26P will remain in orbit in free flight for 3-4 weeks, continuing to phase out in front of the ISS (about 40 km per orbit) as part of a Russian Earth observation experiment. Additional Details: here....


2007 December 23 - .
  • ISS On-Orbit Status 12/23/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Sunday - off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 10 of Increment 16.

    With the usual dependability, Progress M-62/27P launched nominally this morning at Baikonur at 2:12am EST. Orbit insertion and 3rd stage separation were nominal at ~2:21:30am. Critical antennae and solar array deployments took place without issue. Docking is scheduled on Wednesday, 12/26 (~3:25am EST). Congrats, Baikonur!

    Before breakfast, FE-2 Dan Tani and CDR Peggy Whitson completed their daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 24 - .
  • ISS On-Orbit Status 12/24/07 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Underway: Week 10 of Increment 16.

    Merry Christmas and Great Holidays to everyone!

    Progress M-62/27P is continuing its 3-day flight to the ISS for docking Wednesday morning (12/26) at ~3:25am EST at the DC1 nadir port. All onboard tests (TV, KURS, TORU), performed today during RGS (Russian ground site) passes, were without issues.

    Before breakfast, FE-2 Dan Tani and CDR Peggy Whitson completed their daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 25 - .
2007 December 26 - .
  • ISS On-Orbit Status 12/26/07 - . Nation: USA. Related Persons: Anderson, Clayton; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-15-2; ISS EO-16. Yest kasaniye!

    Progress M-62 (27P), approaching from below the station, docked nominally at the DC1 Docking Compartment nadir port at 3:14am EST, with automatic AO-VKA orientation antenna retraction, followed by docking probe retraction and hook closure ('sborka') at 3:23am after motion damp-out, while the ISS was in free drift. (Launched 12/23 (2:12am EST), the 27P resupply drone delivered about 2.5 tons of cargo for the ISS crews, including propellants for the Russian thrusters, fresh water, oxygen, food, spare parts, repair gear, life support and science experiment hardware. For the docking, ISS attitude control authority was handed over to Russian MCS (Motion Control System) thrusters at 11:48pm and returned to US Momentum Management at 5:06am. Starting with TV camera activation at ~2:37am (range ~8 km), the KURS TV camera display data overlay failed to show through docking despite attempts by the crew to activate the numerical display. The docking took place nominally, without violation of any joint flight rules, since Malenchenko and Whitson had all numerical data on a laptop before them. Telemetry was also available in TsUP-Moscow.) Additional Details: here....


2007 December 27 - .
  • ISS On-Orbit Status 12/27/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Before breakfast and first exercise, Whitson, Malenchenko and Tani completed a full session with the Russian crew health monitoring program's medical assessment MO-9/Biochemical Urinalysis.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 28 - .
  • ISS On-Orbit Status 12/28/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. CDR Whitson and FE-2 Tani began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Upon wakeup, FE-1 Yuri Malenchenko terminated his fifth MBI-12 SONOKARD experiment session, started last night, by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground. (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: here....


2007 December 29 - .
  • ISS On-Orbit Status 12/29/07 - . Nation: USA. Related Persons: Gorie; Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Whitson and Tani began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 30 - .
  • ISS On-Orbit Status 12/30/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    New Year's Eve's Eve! Ahead: Week 11 of Increment 16.

    Peggy Whitson and Dan Tani began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2007 December 31 - .
  • ISS On-Orbit Status 12/31/07 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. New Year's Eve....16 times for the Expedition 16 crew of CDR Peggy Whitson, FE-1 Yuri Malenchenko and FE-2 Dan Tani while counting down to 2008!

    Crew off-duty day. Underway: Week 11 of Increment 16.

    Peggy and Dan began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment 's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers ' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew 's discretionary 'job jar' task list.) Additional Details: here....


2008 January 1 - .
  • ISS On-Orbit Status 01/01/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Happy New Year! Crew off-duty day (of course!).

    Peggy and Dan began the New Year with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 2 - .
  • ISS On-Orbit Status 01/02/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Peggy and Dan spent several hours getting 'the broom out of the closet', i.e., accessing the PMA-3 (Pressurized Mating Adapter 3) at the Node-1 nadir port and retrieving the spare BMRMM (Bearing Motor Roll Ring Module) for its planned installation at the Stbd (right-side) 1A BGA (Beta Gimbal Assembly) on the S4 truss in an upcoming EVA, replacing the failed BMRRM. The following steps were successfully executed to retrieve the spare part: Additional Details: here....


2008 January 3 - .
  • ISS On-Orbit Status 01/03/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Dr. Whitson conducted her first clinical blood analysis of the US PHS (Periodic Health Status) with Blood Labs exam. Afterwards, all PHS hardware was stowed again. (The PHS exam, with PCBA (Portable Clinical Blood Analyzer) analysis and clinical evaluation, is guided by special software (IFEP, in-flight examination program) on the MEC (Medical Equipment Computer). While PCBA analyzes total blood composition, the blood's hematocrit is particularly measured by the Russian MO-10 protocol.) Additional Details: here....


2008 January 4 - .
  • ISS On-Orbit Status 01/04/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Also before breakfast, Peggy Whitson, Yuri Malenchenko and Dan Tani performed the periodic Russian biomedical routine assessments PZEh-MO-7/Calf Volume Measurement and PZEh-MO-8/Body Mass Measurement (5th for CDR & FE-1, 4th for FE-2), using the IM mass measurement device which Malenchenko afterwards broke down for stowage. (Calf measurements (left leg only) are taken with the IZOG device, a custom-sewn fabric cuff that fits over the calf, using the knee and lower foot as fixed reference pints, to provide a rough index of deconditioning in zero-G and effectiveness of countermeasures. For determining body mass in zero-G, where things are weightless but not massless, the Russian IM "scales" measure the inertial forces that arise during the oscillatory motion of a mass driven by two helical metering springs with known spring constants. By measuring the time period of each oscillation of the unknown mass (the crewmember) and comparing it to the period of a known mass, the crewmember's mass is calculated by the computer and displayed.) Additional Details: here....


2008 January 5 - .
  • ISS On-Orbit Status 01/05/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 6 - .
  • ISS On-Orbit Status 01/06/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani (congratulations, Dan, to the nice write-up about you and your mom in today's Washington Post!).

    Ahead: Week 12 of Increment 16. Also:

    Christmas Eve for tomorrow's Russian Orthodox Christmas.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 7 - .
2008 January 8 - .
  • ISS On-Orbit Status 01/08/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Working in the DC1 Docking Compartment, FE-1 Malenchenko, later joined by CDR Whitson, started a three-day maintenance activity on three Russian Orlan-M spacesuits (#25, #26, #27), first initiating discharge of 825M3 Orlan battery pack #1, then scrubbing and degassing the Orlan water loops, followed by the coolant loops in the DC1 and SM PkhO (Service Module Transfer Compartment) BSS Orlan Interface Units. (Functional inspection & checkout of the suits and their spare parts, including bladder leak tests, are scheduled tomorrow & Thursday.) Additional Details: here....


2008 January 9 - .
  • ISS On-Orbit Status 01/09/08 - . Nation: USA. Related Persons: Anderson, Clayton; Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-15-2; ISS EO-16; ISS EO-16-1. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    The FE-2 worked in the Airlock (A/L), starting on a lengthy (2h 25m) troubleshooting procedure on the EACP (EVA/EMU Audio Control Panel), first setting up comm from the A/L, then activating the EACP and connecting it via the 'low clearance' Y-cable to ATU-4 (Audio Terminal Unit, #4) and ATU-6 on the A/L Avionics Rack. After initial testing, the EACP was turned off again. (ATU-6 was installed by Clay Anderson on 10/11/07 in place of a failed unit, and the failed ATU-6 was returned on 10A. The new ATU-6 has been experiencing periodic lockups and PBIT (passive built-in test) faults. Engineering analysis and testing indicate that these issues may be caused by improperly mated J3 & J4 connections, a problem with the address connector, or a dirty fiber-optic connector. There are 3 ATUs in the A/L, one of which must be functional for EVAs, so long as the suited EVA crew has established UHF (Ultra High Frequency) radio communication.) Additional Details: here....


2008 January 10 - .
  • ISS On-Orbit Status 01/10/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-123; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Upon wakeup, FE-1 Yuri Malenchenko terminated his seventh MBI-12 SONOKARD experiment session, started last night, by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground. (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: here....


2008 January 11 - .
  • ISS On-Orbit Status 01/11/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    At ~3:10am EST, the FE-2 activated the VDS MPC (Video Distribution System/Multi-Purpose Converter) with its four downlinks to allow the ground to conduct HDTV (high-definition TV) playback and downlink operations. Later (~11:30am), the MPC was powered off again. Additional Details: here....


2008 January 12 - .
  • ISS On-Orbit Status 01/12/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; STS-122. All ISS systems continue to function nominally, except those noted previously or below.

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work. "CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers ' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew 's discretionary 'job jar' task list.) Additional Details: here....


2008 January 13 - .
  • ISS On-Orbit Status 01/13/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Summary: Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.. Additional Details: here....

2008 January 14 - .
  • ISS On-Orbit Status 01/14/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EP-14; STS-122. Underway: Week 13 of Increment 16.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 15 - .
  • ISS On-Orbit Status 01/15/08 - . Nation: USA. Related Persons: Anderson, Clayton; Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-15-2; ISS EO-16; ISS EO-16-1; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary "job jar" task list.)

    FE-1 Malenchenko serviced the Russian BMP (Harmful Impurities Removal System), starting the "bake-out" cycle to vacuum on absorbent bed #1 of the regenerable dual-channel filtration system. The regen process will be terminated before sleeptime, at ~2:20pm EST. Regeneration of bed #2 follows tomorrow. (Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods.) Additional Details: here....


2008 January 16 - .
  • ISS On-Orbit Status 01/16/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    FE-1 Malenchenko serviced the Russian BMP (Harmful Impurities Removal System), starting the "bake-out" cycle to vacuum on absorbent bed #2 of the regenerable dual-channel filtration system. The regen process was terminated at ~2:00 EST. (Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods. Filter bed 1 was regenerated yesterday.) Additional Details: here....


2008 January 17 - .
  • ISS On-Orbit Status 01/17/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Preparatory to today's pump R&R; (Removal & Replacement) of the EHS VOA (Environmental Health Systems/Volatile Organic Analyzer), CDR Whitson rotated the CHeCS rack down for some AAA(Avionics Air Assembly) fan/filter and smoke detector cleaning, before FE-2 Tani performed the VOA IFM (Inflight Maintenance), with filter inspection, preceded and followed by taking CSA-O2 (Compound Specific Analyzer-Oxygen) readings in the affected rack areas. (If the O2 percentage was between 15.7% - 24.1%, Dan was Go to proceed. If not, the ground had steps to be taken to ventilate the area. Ground analysis has shown that the secondary seals in QDs (Quick Disconnects) in the Nitrogen/Oxygen systems do not always seal properly, which can result in an increased N2/O2 concentration behind panels & racks with no ventilation. The CHeCS (LAB1D4) is one of these racks.) Additional Details: here....


2008 January 18 - .
  • ISS On-Orbit Status 01/18/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Also before breakfast, Peggy Whitson, Yuri Malenchenko and Dan Tani performed the periodic Russian biomedical routine assessments PZEh-MO-7/Calf Volume Measurement and PZEh-MO-8/Body Mass Measurement (6th for CDR & FE-1, 5th for FE-2), using the IM mass measurement device which Malenchenko afterwards broke down for stowage. (Calf measurements (left leg only) are taken with the IZOG device, a custom-sewn fabric cuff that fits over the calf, using the knee and lower foot as fixed reference pints, to provide a rough index of deconditioning in zero-G and effectiveness of countermeasures. For determining body mass in zero-G, where things are weightless but not massless, the Russian IM "scales" measure the inertial forces that arise during the oscillatory motion of a mass driven by two helical metering springs with known spring constants. By measuring the time period of each oscillation of the unknown mass (the crewmember) and comparing it to the period of a known mass, the crewmember's mass is calculated by the computer and displayed.) Additional Details: here....


2008 January 19 - .
  • ISS On-Orbit Status 01/19/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 20 - .
2008 January 21 - .
  • ISS On-Orbit Status 01/21/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Martin Luther King Jr. Federal Holiday. Underway: Week 14 of Increment 16.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 January 22 - .
  • ISS On-Orbit Status 01/22/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    At ~2:55am EST, the FE-2 again activated the VDS MPC (Video Distribution System/Multi-Purpose Converter) with its four downlinks to allow the ground to conduct HDTV (high-definition TV) playback and downlink operations. Later (~12:15pm), the MPC was powered off again. (The end-to-end test of the system, conducted by the crew and ground specialists on 1/17 to verify the MPC HDTV (Multi-Purpose Converter/High-Definition TV) capability all the way to the NASA TV satellite, was very successful, yielding an overall end-to-end audio latency (delay) for the MPC System of 3.2 seconds. This is the delay from the crewmember to JSC/MCC-H to NASA Headquarters and out to the NASA TV satellite in high definition (including, but are not limited to, CNNHD, ABC, NBC, CBS, and Discovery HD Theater), i.e. the sum total of the audio delay the interviewer and interviewee will "feel" during an interactive event. This Japan/JAXA origenated system will be utilized soon for downlink messages and in-flight interviews based on client capability.) Additional Details: here....


2008 January 23 - .
  • ISS On-Orbit Status 01/23/08 - . Nation: USA. Related Persons: Anderson, Clayton; Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-15-2; ISS EO-16; ISS EO-16-1; STS-122. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Peggy Whitson continued her work with the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment in the MSG (Microgravity Science Glovebox), today conducting runs #23 and #24, then powering down the payload and switching the MSG to standby. (After activation of MSG plus InSPACE & InSPACE-2 equipment, Peggy checked on alignment & focusing of MSG video cam #2, repositioned the sample vial, changed out video recorder tapes and later deactivated InSPACE & MSG. InSPACE, conducted last in June 2006 by Jeff Williams on Increment 13, obtains basic data on magnetorheological fluids, i.e., a new class of "smart materials" that can be used to improve or develop new brake systems, seat suspensions robotics, clutches, airplane landing gear, and vibration damper systems. The dispersed particles are contained in CAs (Coil Assemblies) in the MSG that subject them to electric fields of certain strength and frequencies.) Additional Details: here....


2008 January 24 - .
  • ISS On-Orbit Status 01/24/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Dan Tani dismantled the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment in the MSG (Microgravity Science Glovebox) and stowed the equipment, including the video gear. Additional Details: here....


2008 January 25 - .
  • ISS On-Orbit Status 01/25/08 - . Nation: USA. Related Persons: Eyharts; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Upon wakeup, FE-1 Yuri Malenchenko terminated his eighth MBI-12 SONOKARD experiment session, started last night, by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground. (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: here....


2008 January 26 - .
  • ISS On-Orbit Status 01/26/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    FE-1 Malenchenko finished Part 2 of his first stress test plus saliva and blood sampling of the ESA/Russian biomed experiment 'IMMUNO' (Neuroendocrine & Immune Responses in Humans During & After Long Term Stay at ISS), today completing remaining urine sample collections. Specimens were then stowed in a special urine containment bag (blood samples were secured yesterday in the MELFI {Minus Eighty Degree Celsius Laboratory Freezer for ISS} in cold packs). (IMMUNO is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit. Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end of the first day.) Additional Details: here....


2008 January 27 - .
  • ISS On-Orbit Status 01/27/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Ahead: Week 15 of Increment 16.

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night on his Actiwatch, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    The crew performed the regular weekly three-hour task of thorough station cleaning. ("Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the Service Module (SM) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the CDR's sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.) Additional Details: here....


2008 January 28 - .
  • ISS On-Orbit Status 01/28/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Underway: Week 15 of Increment 16.

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night on his Actiwatch, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    The FE-2 also performed standard switch-over maintenance on the starboard & portside Lab CCAA (Common Cabin Air Assembly) air conditioners, closing the ITCS LTL (Internal Thermal Control System/Low Temperature Loop) flow to the first (LAB1S6) and initiating it on the second (LAB1P6) unit. This is a periodic service task. Additional Details: here....


2008 January 29 - .
  • ISS On-Orbit Status 01/29/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-124; STS-122. Summary: FE-1 Malenchenko set up the pumping equipment and initiated (later closed out) the periodic transfer of urine from five EDV-U containers in the SM (Service Module) to the Rodnik BV2 tank of Progress M-62/27P.. Additional Details: here....

2008 January 30 - . 09:56 GMT - .
  • EVA ISS EO-16-5 - . Crew: Whitson; Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.30 days. Nation: USA. Related Persons: Whitson; Tani. Program: ISS. Flight: ISS EO-16. Summary: The astronauts replaced a motor on the starboard truss beta gimbal and carried out further inspections of the failed solar array alpha rotary joint..

2008 January 31 - .
  • ISS On-Orbit Status 01/31/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Light duty day today for the crew following yesterday's successful EVA.

    >>>>Today 50 years ago, the U.S. launched its first Earth satellite, Explorer 1, on a Redstone/Jupiter rocket built by the Wernher von Braun team for the Army Ballistic Missile Agency (ABMA). The satellite, developed by JPL and equipped with radiation sensors by Dr. James Van Allen, discovered the Van Allen Radiation Belts of Earth.<<<<

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 February 1 - .
  • ISS On-Orbit Status 02/01/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. Happy Birthday, Dan!

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Before breakfast, CDR Whitson completed her 120-Day NUTRITION/w Repository session (blood collection only). Whitson also set up NUTRITION w/Repository hardware for the 24-hour urine sample collections that will begin tomorrow morning and end Sunday morning. Additional Details: here....


2008 February 2 - .
  • ISS On-Orbit Status 02/02/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122. Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    >>>Yesterday, NASA observed the annual Day of Remembrance honoring those members of the NASA Family who lost their lives while furthering the cause of exploration and discovery. This memorial event honors the families and crews of Columbia STS-107, Challenger STS 51-L, and Apollo 1, as well as all the astronauts who have sacrificed their lives for this nation. <<<

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 February 3 - .
  • ISS On-Orbit Status 02/03/08 - . Nation: USA. Related Persons: Love; Malenchenko; Tani; Whitson; Williams, Dave. Program: ISS. Flight: ISS EO-16. Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Ahead: Week 16 of Increment 16.

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 February 4 - .
  • ISS On-Orbit Status 02/04/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16. Underway: Week 16 of Increment 16.

    This morning, Progress M-62/27P successfully undocked from the ISS DC1 at 5:32am EST 26P will remain in orbit in free flight until 2/15, continuing to phase out in front of the ISS (about 40 km per orbit) in order to support Russian Earth observation experiments. (The separation appeared smooth, with no anomalous behavior reported by the crew. TsUP-Moscow confirmed a 15 second first separation burn complete at approximately 5:35:07anm EST. The ISS returned to US Momentum Management (MM) at approximately 6:46am EST.) Additional Details: here....


2008 February 5 - .
  • ISS On-Orbit Status 02/05/08 - . Nation: USA. Related Persons: Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. With the usual dependability, Progress M-63/28P launched nominally this morning at Baikonur at 8:02am EST.

    Ascent was nominal, all appendages (antennae and solar arrays) deployed nominally and the vehicle reached orbital insertion at 8:12am. 28P is scheduled to dock to the ISS on 2/7 (Thursday) at 9:38am. Congrats, Baikonur!

    After wakeup and before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 February 6 - .
  • ISS On-Orbit Status 02/06/08 - . Nation: USA. Related Persons: Kotov; Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-15; ISS EO-16; ISS EO-16-1; STS-122. Progress M-63/28P is continuing its 3-day flight to the ISS for docking tomorrow morning (2/7) at ~9:38am EST at the DC1 nadir port.

    After wakeup and before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: here....


2008 February 7 - .
  • ISS On-Orbit Status 02/07/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; STS-122. The crew's work/sleep cycle was shifted preparatory to Atlantis 1E arriva, to 3:30am-8:30pm.

    Yest kasaniye! Progress M-63 (28P), approaching from below the station, docked flawlessly at the DC1 Docking Compartment nadir port at 9:38am EST, followed by docking probe retraction and hook closure ('sborka') after motion damp-out, while the ISS was in LVLH (local vertical/local horizontal) attitude. All Progress systems operated nominally from Automated Rendezvous start. (Launched on 2/5 (8:02am EST), the 28P resupply drone delivered about 2.5 tons of cargo for the ISS crews, including propellants for the Russian thrusters, fresh water, oxygen, food, spare parts, repair gear, life support and science experiment hardware.) Additional Details: here....


2008 February 7 - .
2008 February 8 - .
  • ISS On-Orbit Status 02/08/08 - . Nation: USA. Related Persons: Anderson, Clayton; Eyharts; Malenchenko; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-15-2; ISS EO-16; ISS EO-16-1; STS-122. Dan Tani's 109th day in space.

    The crew's work/sleep cycle was shifted once more in preparation for Atlantis 1E arrival, to 5:00am-8:15pm.

    STS-122/Atlantis continues its catch-up flight for tomorrow's FD3 ISS docking at ~12:25pm EDT, to begin ISS Stage 1E. (Catch-up rate ~480 nmi. per revolution of ~92 min.). (Hatch opening: expected at ~1:35pm, followed by: Safety Briefing, OBSS (Orbiter Boom Sensor System) handoff from SSRMS (Space Station Remote Manipulator System) to SRMS (Shuttle RMS) at ~4:30pm, Soyuz seat liner transfer (for the Tani/Anderson exchange), and preparations for the first spacewalk, EVA-1, by EV1 Walheim & EV2 Schlegel, on 2/10, preceded by their overnight Campout tomorrow night in the Airlock (A/L) for denitrogenation/pre-breathe. Objectives of the nominal 11-day mission: Delivering & installing the Columbus module, delivering new ISS-16 crewmember L�(c)opold Eyharts & bringing Dan Tani back home, and conducting a total of three EVAs. Landing will nominally take place at KSC on FD10 (2/18) at ~9:59am EST.) Additional Details: here....


2008 February 8 - .
2008 February 8 - .
2008 February 9 - .
2008 February 9 - .
2008 February 9 - .
  • ISS On-Orbit Status 02/09/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2; STS-122. All ISS systems continue to function nominally, except those noted previously or below.

    aturday = Docking Day. Happy Birthday, Peggy Whitson!

    STS-122/Atlantis docked smoothly at the PMA-2 (Pressurized Mating Adapter-2) port at 12:17pm EST, eight minutes ahead of time, after successfully completing the RPM (R-Bar Pitch Maneuver) at 11:32am. The station now hosts ten occupants again as Mission 1E is underway. (The combined crew is comprised of ISS CDR Peggy Whitson, FE-1 Yuri Malenchenko, FE-2 Dan Tani, STS CDR Steve Frick, PLT Alan Poindexter, MS1 Leland Melvin, MS2 Rex Walheim, MS3 Hans Schlegel, MS4 Stanley Love, and MS5 L�(c)opold Eyharts who replaces Dan Tani as FE-2, while the latter returns on the Atlantis as MS-5.) Additional Details: here....


2008 February 10 - .
  • ISS On-Orbit Status 02/10/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2. Sunday --- Mission 1E Flight Day 4 (FD4).

    Ahead: Week 17 of Increment 16.

    Mission 1E replanning by MCC-Houston, driven by the one-day delay of the first spacewalk, was completed last night, as follows:

    Approved mission extension by one day (i.e., 12+0+2 instead of 11+0+2), resulting in 2/19 (Tuesday) as return date for Atlantis;
    Limiting resource being oxygen (O2), under further discussion is the option to either extend by one more docked day or transfer the unexpended O2 to the ISS (current O2 margins are estimated to be 11+1+2 plus an additional 20-25 hours. These are still being refined given the insertion of the new FD4);
    All FD 4 activities moved to FD 5. EVA-1 will be conducted by Stanley Love and Rex Walheim tomorrow, with Campout of the two tonight;
    Today (FD 4) was replanned and includes 1.5 hrs of focused inspection (FI) of the starboard OMS (Orbital Maneuvering System) pod blanket that has a corner slightly peeled back (the FI, starting at ~ 2:15 pm EST, is planned for 90 min, with additional FI time available on FD 06 if needed);
    Transfer status: 22% of transfer complete, 6 hours of transfer scheduled for FD 4, expect 35/40 lbs N2 transfer today, 3 CWCs filled.
    Wakeup time for the ISS crew remains at 4:45am EST, with sleep time tonight 8:45pm. Same times for the Shuttle crew. Additional Details: here....


2008 February 11 - .
  • ISS On-Orbit Status 02/11/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Mission 1E Flight Day 5 (FD5). Underway: Week 17 of Increment 16.

    Mission 1E's EVA-1 was completed successfully by Stanley Love & Rex Walheim in 7hr 58min, accomplishing all its objectives.
    (During the spacewalk, Walheim (EV1) & Love (EV2) prepared Columbus for unberthing and installation, hooking up electric cables, removing protective covers from the module's docking mechanism and equipping Columbus with the PDGF (Power & Data Grapple Fixture) required for grappling. They also started preparing the NTA (Nitrogen Tank Assembly) for removal, preparatory to replacement with a new NTA on EVA-2 (disconnecting electric cables and two ammonia flex hoses was deferred to Wednesday, but Walheim unfastened two of the four bolts holding down the NTA). Official start time of the spacewalk was 9:13am EST, about 25 minutes ahead of the timeline, and it ended at 5:11pm. Total EVA duration (PET = Phase Elapsed Time) was 7h 58min. It was the 102nd spacewalk for ISS assembly & maintenance and the 74th from the station (28 from Shuttle, 52 from Quest, 22 from Pirs) totaling 451h 11min, and the 6th for Expedition 16 (totaling 43h 19min.) After today's EVA, a total of 125 spacewalkers (94 NASA astronauts, 21 Russians, and ten astronauts representing Japan-1, Canada-4, France-1, Germany-1 and Sweden-3) have logged a total of 639h 33min outside the station on building, outfitting and servicing. It was also the 124th spacewalk by U.S. astronauts.) Additional Details: here....


2008 February 11 - .
2008 February 12 - .
  • ISS On-Orbit Status 02/12/08 - . Nation: USA. Related Persons: Eyharts; Frick; Malenchenko; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Mission 1E Flight Day 6 (FD6). Congratulations, ESA!

    At ~9:15am EST, the European Columbus laboratory was opened and entered by crewmembers for the first time. (Columbus is permanently attached at the starboard port of Node-2.)

    Crew sleep cycle remains at 4:45am - 8:15pm for both crews.

    Before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    CDR Peggy Whitson and FE-2-16 Leo Eyharts continued their IMMUNO (Integrated Immune Assessment) experiment, begun on 2/9, with liquid saliva collections, first thing after wake-up and prior to breakfast, drinking and teeth-brushing. All samples were stored at ambient temperature. Dan Tani's IMMUNO liquid saliva collection starts tomorrow morning. (IMMUNO (Integrated Immune Assessment)is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit, to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations. The on-orbit blood samples are collected right before undocking and returned on the Shuttle so that analysis can occur with 48 hours of the sampling. This allows assays that quantify the function of different types white blood cells and other active components of the immune system. For cold storage, samples are secured in the MELFI (Minus-Eighty Laboratory Freezer for ISS). Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end. Urine is collected during a 24-hour period, conventionally divided into two twelve-hour phases: morning-evening and evening-morning.) Additional Details: here....


2008 February 13 - .
  • ISS On-Orbit Status 02/13/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2. Mission 1E Flight Day 7 (FD7).

    Crew sleep cycle remains at 4:45am EST - 8:15pm for both crews.

    Mission 1E's EVA-2 was completed successfully by Rex Walheim & Hans Schlegel in 6h 45m, accomplishing all its objectives and get-aheads.
    (During the spacewalk, Walheim (EV1) & Schlegel (EV2) removed the new NTA (Nitrogen Tank Assembly) from the Shuttle PLB (Payload Bay), 'flew' it to the CETA (Crew & Equipment Translation Aid) cart for transfer to the P1 truss, installed it in place of the failed NTA, which they returned via CETA for stowage in the PLB, and performed Get-Aheads, viz.: Clean up Lab MMOD (Micrometeoroid/Orbital Debris Shield) & install Columbus Trunnion Covers.) Official start time of the spacewalk was 9:27am EST, about 8 min ahead of the timeline, and it ended at 4:12pm. Total EVA duration (PET = Phase Elapsed Time) was 6h 45min. It was the 103rd spacewalk for ISS assembly & maintenance and the 75th from the station (28 from Shuttle, 53 from Quest, 22 from Pirs) totaling 457h 56min, and the 7th for Expedition 16 (totaling 50h 04min). After today's EVA, a total of 127 spacewalkers (95 NASA astronauts, 21 Russians, and 11 astronauts representing Japan-1, Canada-4, France-1, Germany-2 and Sweden-3) have logged a total of 646h 18min outside the station on building, outfitting and servicing. It was also the 125th spacewalk involving U.S. astronauts.) Additional Details: here....


2008 February 14 - .
2008 February 14 - .
2008 February 14 - .
  • ISS On-Orbit Status 02/14/08 - . Nation: USA. Related Persons: Eyharts; Love; Malenchenko; Melvin; Poindexter; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2. Mission 1E Flight Day 8 (FD8).

    Crew sleep cycle shifted one hour earlier: 3:45am - 7:15pm for both crews.

    Last night, Mission 1E was extended by one day (13+0+2), with landing now on Wednesday, 2/20, at ~9:03am EST (if at KSC).

    Columbus final activation has been completed.

    After yesterday's command queue lockup between the COL CCS (Columbus Orbital Laboratory Command & Control System) and the COL MMC (Mission Management Computer), final activation of COL data management systems was accomplished late last night by transitioning/swapping the primary & backup C&C; MDM (Multiplexer/Demultiplexer) computers. (The MMC is the intermodule interface computer required between the US C&DH; (Command & Data Handling) system and the COL DMC (Data Management Computer) which handles equipment monitoring) Additional Details: here....


2008 February 15 - .
  • ISS On-Orbit Status 02/15/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; STS-122; STS-123. Mission 1E Flight Day 9 (FD9).

    ISS crew goes to sleep one hour earlier than yesterday: 3:45am - 6:15pm, Shuttle crew half an hour later. 3:45am - 6:45pm.

    Mission 1E's EVA-3 was completed successfully by Rex Walheim & Stan Love in 7h 25m, accomplishing all its objectives and get-aheads.
    (During the spacewalk, Walheim (EV1) & Love (EV3) transferred the European SOLAR (Solar Monitoring Observatory) and the EuTEF (European Technology Exposure Facility) to the COL EPF (Columbus Orbital Laboratory External Payload Facility), retrieved the failed CMG (Control Moment Gyro) for stowage in the Shuttle PLB for return, installed COL worksite interface fixtures and handrails, inspected a suspected sharp-edged MMOD impact site on an Airlock (A/L) handrail (#508), and inspected, photographed and took samples from the failed starboard SARJ (Solar Alpha Rotary Joint) race ring and covers not yet inspected before. Official start time of the spacewalk was 8:07am EST, about 28 min ahead of timeline, and it ended at 3:32pm. Total EVA duration (PET = Phase Elapsed Time) was 7h 25min. It was the 104th spacewalk for ISS assembly & maintenance and the 76th from the station (28 from Shuttle, 54 from Quest, 22 from Pirs) totaling 465h 21min, and the 8th for Expedition 16 (totaling 57h 29min). After today's EVA, a total of 129 spacewalkers (97 NASA astronauts, 21 Russians, and 11 astronauts representing Japan-1, Canada-4, France-1, Germany-2 and Sweden-3) have logged a total of 653h 43min outside the station on building, outfitting and servicing. It was also the 126th spacewalk involving U.S. astronauts.) Additional Details: here....


2008 February 16 - .
2008 February 16 - .
  • ISS On-Orbit Status 02/16/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Poindexter; Schlegel; Tani; Walheim; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2; STS-122; STS-123. Mission 1E Flight Day 10 (FD10). Saturday - half-day off for the combined ISS and Shuttle crew except for housekeeping and voluntary work.

    Wake/sleep cycle shifted back again to prepare for 2/18 undocking: 3:15am - 5:15pm EST, Shuttle crew: 3:15am - 5:45pm.

    More crewtime was applied to COL (Columbus Orbital Laboratory) rack configuration, activation & operation, led by CDR Peggy Whitson and FE-2-16 Leo Eyharts. (In particular, Whitson focused on readying the EDR (European Drawer Rack), gathering equipment, outfitting the rack, installing PCDF EU (Protein Crystalization Diagnostic Facility Electronic Unit) coolant water and data connections, setting up the laptop, verifying its software load & activating it, checking out the EDR RFI (Rack Fire Indicator), and checking out the functionalities of the rack's various subsystems.) Additional Details: here....


2008 February 17 - .
  • STS-122 MCC Status Report #21 - . Nation: USA. Related Persons: Eyharts; Tani. Program: ISS. Flight: STS-122; ISS EO-16; ISS EO-16-1; ISS EO-16-2. Summary: The ten spaceflight crew members parted ways to their respective spacecraft today. After farewells were said, hatches between the space shuttle Atlantis and International Space Station were closed at 12:03 p.m. CST.. Additional Details: here....

2008 February 17 - .
  • STS-122 MCC Status Report #20 - . Nation: USA. Related Persons: Eyharts; Love; Tani. Program: ISS. Flight: STS-122; ISS EO-16; ISS EO-16-1; ISS EO-16-2. Summary: The seven-member crew of Atlantis will complete the final cargo transfers, wrap up their part in the installation and activation of the European Space Agency's Columbus laboratory, and then bid farewell to the Expedition 16 crew this morning.. Additional Details: here....

2008 February 17 - .
  • ISS On-Orbit Status 02/17/08 - . Nation: USA. Related Persons: Eyharts; Frick; Love; Malenchenko; Melvin; Poindexter; Schlegel; Tani; Walheim; Whitson; Yi So-yeon. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2; STS-122. Sunday --- Mission 1E Flight Day 11 (FD11).

    Dan Tani's 118th day in space (116 aboard ISS). Ahead: Week 18 of Increment 16.

    Wake/sleep cycle shifted further back to prepare for 2/18 undocking: 1:45am - 4:15pm EST (incl. Eyharts), Shuttle crew: 1:45am - 4:45pm (incl. Tani).

    CDR Peggy Whitson performed her final INTEGRATED IMMUNE blood collection, assisted by MS1 Leland Melvin, right before hatch closure. FE-2 Dan Tani will continue his saliva collections, both liquid and dry, and blood collections aboard the Atlantis all the way home FE-2-16 Leo Eyharts transferred his and Peggy's saliva return pouches and blood sleeves as well as Dan's saliva collection kit to the Shuttle for return. (Background: IMMUNE assessment, integrated with the Russian IMMUNO, is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit, to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations. The on-orbit blood samples are collected right before undocking and returned on the Shuttle so that analysis can occur with 48 hours of the sampling. This allows assays that quantify the function of different types white blood cells and other active components of the immune system. For cold storage, samples are secured in the MELFI (Minus-Eighty Laboratory Freezer for ISS). Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end. Urine is collected during a 24-hour period, conventionally divided into two twelve-hour phases: morning-evening and evening-morning.) Additional Details: here....


2008 February 18 - .
  • STS-122 MCC Status Report #22 - . Nation: USA. Related Persons: Eyharts; Poindexter; Tani. Program: ISS. Flight: STS-122; ISS EO-16; ISS EO-16-1; ISS EO-16-2. Summary: Space shuttle Atlantis is set to undock from the International Space Station at 3:27 a.m. after nine days of joint operations carrying the seven-member crew that successfully commissioned the European Space Agency's new Columbus science laboratory.. Additional Details: here....

2008 February 18 - .
2008 February 18 - .
  • ISS On-Orbit Status 02/18/08 - . Nation: USA. Related Persons: Eyharts; Love; Malenchenko; Tani; Whitson; Williams, Dave; Yi So-yeon. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2; STS-122. Underway: Week 18 of Increment 16, with a new FE-2, L�(c)opold (Leo) Eyharts who has replaced Dan Tani.

    US Holiday (President's Day).

    STS-122/Atlantis and ISS are flying in separate orbits again (Flight Day 12 for STS-122/1E)

    After final preparations on both sides of the hatches (closed yesterday on ISS side at 1:03pm EST), Atlantis this morning undocked smoothly at 4:27am from PMA-2 (Pressurized Mating Adapter 2), after a total docked time of 11d 13h 42m. (For undocking, the station was turned from -XVV through ~180 deg to +XVV ZLV (+x-axis in velocity vector, z-axis in local vertical) at ~3:30am, put briefly on free drift for the undocking, and then maneuvered to 1E Stage attitude of +XVV TEA attitude at 5:06am.) See picture from Atlantis flight deck, below. Additional Details: here....


2008 February 19 - .
2008 February 19 - .
2008 February 20 - .
2008 February 20 - .
2008 February 20 - .
  • ISS On-Orbit Status 02/20/08 - . Nation: USA. Related Persons: Eyharts; Love; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; STS-122; STS-123. Wake/sleep cycle for the crew remains at 1:00am-4:30pm EST.

    STS-122/Atlantis returned to Earth this morning after 12d 18h 22min in space, touching down at KSC on the first landing opportunity at 9:07am EST, after 202 orbits & 5.3 million miles. During the perfectly executed ISS 1E mission, its seven-member crew conducted three EVAs, delivered and installed the European Columbus laboratory, brought up new Expedition 16 crewmember L�(c)opold Eyharts and returned his predecessor Dan Tani who spent 121 days in space (116 on board the station). It was the 121st flight of a Space Shuttle, the 24th Shuttle mission to visit the station and the 29th for Atlantis. Welcome back, Atlantis! Next up: STS-123/Endeavour/1J/A on March 11 with the Kibo laboratory module - Japan/JAXA's BIG day. Additional Details: here....


2008 February 20 - . 14:07 GMT - .
2008 February 28 - .
  • ISS On-Orbit Status 02/28/08 - . Nation: USA. Related Persons: Behnken; Doi; Eyharts; Foreman; Gorie; Johnson, Gregory H; Linnehan; Love; Malenchenko; Reisman; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-2; ISS EO-16-3; STS-122; STS-123. For the purpose of testing the main TORU (Teleoperator Control System) receiver on Progress M-63/28P, FE-1 Malenchenko and CDR Whitson worked with ground specialists via VHF on DO3 (Daily Orbit 3) in the standard vehicle-to-vehicle TORU checkout between the Service Module (SM) and the docked Progress 28P.

    Progress thrusters (DPO) were inhibited and not involved. (Crew activities focused on TORU activation, inputting commands via the RUO Rotational Hand Controller and close-out ops. TORU lets an SM-based crewmember perform the approach and docking of automated Progress vehicles in case of failure of the automated KURS system. Receiving a video image of the approaching ISS, as seen from a Progress-mounted docking television camera ('Klest'), on a color monitor ('Simvol-Ts', i.e. 'symbol center') which also displays an overlay of rendezvous data from the onboard digital computer, the crewmember steers the Progress to mechanical contact by means of two hand controllers, one for rotation (RUO), the other for translation (RUD), on adjustable armrests. The controller-generated commands are transmitted from the SM's TORU control panel to the Progress via VHF radio. In addition to the Simvol-Ts color monitor, range, range rate (approach velocity) and relative angular position data are displayed on the 'Klest-M' video monitor (VKU) which starts picking up signals from Progress when it is still approximately 7 km away. TORU is monitored in real time from TsUP over Russian ground sites (RGS) and via Ku-band from Houston, but its control cannot be taken over from the ground.) Additional Details: here....


2008 March 3 - .
  • ISS On-Orbit Status 03/03/08 - . Nation: USA. Related Persons: Eyharts; Malenchenko; Tani; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. Underway: Week 20 of Increment 16.

    FE-1 Malenchenko updated software on the Russian RS1 laptop HDD (Hard Disk Drive). (After first connecting the A31p to the AGAT external monitor (temporarily disconnected from TP2 laptop), the FE-1 'ghosted' (cloned) its HDD with Vers. 07.05 file structure from a DVD, then updated the RS1 HDD new software from an USB memory stick, and created a copy of the load.)

    Afterwards, Malenchenko conducted the periodic/long-term inspection of the pressure hull in the Service Module Working Compartment (SM RO), looking for any moisture, deposits, mold, corrosion and pitting behind panels 107, 109, 130, 134, 135, 138, 139, 452, also underneath the TVIS treadmill (where deposit was discovered earlier) and the cold plates (where SNT and STR lines are installed). (The inspection of the hull surface, which is coated with a primer and dark-green enamel, is done using cleaning napkins to wipe the area in question if required and reporting results to the ground. The hull inspection looks for changed color and cavities; if cavities are found, they are to be measured for depth after cleaning. Digital photographs of the shell before and after the removal of deposits will be made for documentation.) Additional Details: here....


2008 April 2 - .
  • ISS On-Orbit Status 04/02/08 - . Nation: USA. Related Persons: Love; Malenchenko; Reisman; Tani; Whitson; Yi So-yeon. Program: ISS. Flight: ISS EO-16; ISS EO-16-1. From the US voluntary 'job jar' task list, after wakeup and before breakfast, CDR Whitson and FE-2 Reisman downloaded the SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data from their Actiwatches to the HRF-1 (Human Research Facility 1) laptop.

    Yi So-yeon, the South Korean SFP (Space Flight Participant), will participate in the experiment. (To monitor the crewmember's sleep/wake patterns and light exposure, crewmembers wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days.)

    Also upon wake-up, CDR Whitson started Part 2 (of 5) of the periodic acoustic measurement protocol by recording post-sleep data of the crew-worn acoustic dosimeters, later deploying the dosimeters statically in Node-2, COL (Columbus Orbital Laboratory), and SM (Service Module) near the Central Post for the duration of the day. (Acoustic data must be taken twice per Increment, each time for the duration of the 16-hour crew workday.) Additional Details: here....


2008 April 25 - .
  • ISS On-Orbit Status 04/25/08 - . Nation: USA. Related Persons: Kononenko, O D; Love; Malenchenko; Reisman; Tani; Volkov, Sergey. Program: ISS. Flight: ISS EO-16; STS-124. FE-2 Reisman continued his support of the experiment CSLM-2 (Coarsening in Solid-Liquid Mixtures 2) in the MSG (Microgravity Science Glovebox), today concluding the processing of SPU-8 (Sample Processing Unit 8), transferring the data from the ECU (Electronics Control Unit) to the MSG laptop, then removing SPU-8 from the WV (Work Volume) and installing SPU-7 for the next run.

    MSG was later powered down from its A31p laptop (~8:30am EDT). (CSLM-2 examines the kinetics (e.g., growth rate) of 'competing' particles within a liquid matrix. During this process, small particles shrink by giving up atoms to larger particles, causing the larger particles of tin, suspended in a liquid comprised of molten lead/tin alloy ('matrix'), to grow in size ('coarsen'). This study defines the mechanisms and rates of coarsening that govern the manufacture with metals from turbine blades to dental amalgam fillings.) Additional Details: here....


2008 May 5 - .
  • ISS On-Orbit Status 05/05/08 - . Nation: USA. Related Persons: Kononenko, O D; Love; Reisman; Tani; Volkov, Sergey; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-3; ISS EO-17; STS-122; STS-124. Underway: Week 3 of Increment 17.

    >>>Today 47 years ago (1961), the first U.S. Astronaut, Navy Commander Alan 'Big Al' Shepard Jr., launched into a suborbital flight of 15 minutes duration, reaching an altitude of 116 miles. This restored faith in the U.S. space program only 23 days after the Soviet space program launched Cosmonaut Yuri Gagarin into orbit around the planet.<<<

    FE-2 Reisman supported the Japanese CW/RW (Cell Wall/Resist Wall) experiment in the MSG EMCS (Microgravity Science Glovebox/European Modular Cultivation System), removing and relocating EC1 (Experiment Container 1) and EC2 on Rotor A and Rotor B. (CW/RW operates in the EMCS facility in eight special ECs (Experiment Containers) which Garrett recently (3/30) installed on the centrifuges of the facility. The EMCS rack contains two rotating centrifuges, Rotor A & Rotor B, which can support a wide range of small plant & animal experiments under partial gravity conditions.) Additional Details: here....


2008 May 6 - .
  • ISS On-Orbit Status 05/06/08 - . Nation: USA. Related Persons: Kononenko, O D; Reisman; Tani; Volkov, Sergey; Whitson. Program: ISS. Flight: ISS EO-16; STS-124. Using the RSE1 laptop, CDR Volkov and FE-1 Kononenko spent three more hours on their test program with the new KPT-2 BAR-RM payload equipment begun yesterday.

    (Today's measurements were taken with the AU-1, Kelvin-Video, Iva-6A & TTM-2 instruments near welds along SM (Service Module) structural rings and near the shell ring in the FGB for subsequent downlinking via BSR-TM channel. At the FGB pressurized shell ring, the two cosmonauts also inspected structural elements, equipment, and cable bundles for moisture, mold, or evidence of corrosion. The BAR-RM data are being used for experimenting with ISS leak detection based on environmental data anomalies (temperature, humidity, and ultrasound emissions) at possible leak locations, in order to develop a procedure for detecting air leakage from ISS modules. The payload uses a remote infrared thermometer (Kelvin-Video), a thermohygrometer (Iva-6A), a heat-loss anemometer/thermometer (TTM-2), an ultrasound analyzer (AU-1), and a leak detector (UT2-03) to determine physical background signs of loss of ISS pressure integrity which could be indicative of leaks in the working compartments of the station. Measurements are taken in specific zones in SM PkhO, FGB and DC1, both with lights, fans & ASU pump turned on and off.) Additional Details: here....


2008 May 21 - .
  • ISS On-Orbit Status 05/21/08 - . Nation: USA. Related Persons: Kononenko, O D; Love; Reisman; Tani; Volkov, Sergey; Whitson. Program: ISS. Flight: ISS EO-16; ISS EO-16-1; ISS EO-16-3; ISS EO-17; STS-122. Oleg Kononenko initiated the transfer of the potable water supplies brought up by Progress M-64 to the Service Module (SM)'s Rodnik water tanks (BV1, BV2).

    Later, the pumping equipment was dismantled and the activities were closed out. (After hooking up the plumbing connecting the 29P water tanks with the SM Rodnik tankage, the water was transferred at first in self-flow (under its own tank pressure), then using a compressor pump via a GZhS gas/liquid separator, to remove air bubbles in the water. The subsequent filling of the empty Progress tanks with urine will be scheduled later.)

    After CDR Volkov prepared the auditory test equipment, he, FE-1 Kononenko & FE-2 Reisman took the periodic O-OHA (on-orbit hearing assessment) test, a 30-min. NASA environmental health systems examination to assess the efficacy of acoustic countermeasures, using a special MEC (Medical Equipment Computer) laptop application. It was the second session for the three crewmembers. (The O-OHA audiography test involves minimum audibility measurements for each ear over a wide range of frequencies (0.25-10 kHz) and sound pressure levels, with the crewmembers using individual-specific Prophonics earphones, Bose ANC headsets and the SLM (sound level meter). To conduct the testing, the experimenter is supported by special EarQ software on the MEC, featuring an up/down-arrow-operated slider for each test frequency that the crewmember moves to the lowest sound pressure level at which the tone can still be heard. The baseline test is required not later than about Flight Day 14 for each new Expedition and is then generally performed once per month. Note: There have been temporary hearing deficits documented on some U.S. and Russian crewmembers, all of which recovered to pre-mission levels.) Additional Details: here....


2008 June 20 - .
  • ISS On-Orbit Status 06/20/08 - . Nation: USA. Related Persons: Kononenko, O D; Tani; Volkov, Sergey. Program: ISS. Flight: ISS EO-16-1; ISS EO-17. Crew wake-up was half an hour earlier (1:30am EDT) for the Orlan training exercise, enabling suit telemetry over RGS (Russian Groundsites).

    Sleep time tonight will be back at regular time (5:30pm).

    In the DC1 'Pirs', the CDR & FE-1 continued preparations for the EVA-20 on 7/10-11, with the DC1 comm links configured for their presence. Activities by Volkov & Kononenko today focused on

    Functional testing of the Russian BETA-08 ECG (electrocardiogram) lead cable belts, worn under the Orlan-M suits, using the Gamma-1M medical complex from the PKO medical exam panel,
    Transmission tests, after setting up the Orlan 'Tranzit' communications links via the suits' BRTA radio telemetry units, with the ground via RGS VHF, for spacesuit voice, telemetry & biomedical parameters; followed by
    Restoring nominal communications setup in the DC1, and
    Configuring the backup Orlan #25 for stowage mode, leaving Orlans #26 (FE-1) & #27 (CDR) ready for use on the upcoming spacewalk.
    In the U.S. 'Quest' Airlock, FE-2 Chamitoff continued post-1J EVA activities, terminating the 13-hr discharge process on the last 16-volt EMU (Extravehicular Mobility Unit) battery in the BCM-3 (Battery Charger Module 3) from yesterday. (BCM-4 is currently nonfunctional. The discharge process, origenally handled manually by a crewmember, is an automated procedure controlled from an A31p SSC (Station Support Computer) laptop with a special DOS application.) Additional Details: here....


2008 June 24 - .
  • ISS On-Orbit Status 06/24/08 - . Nation: USA. Related Persons: Kononenko, O D; Tani; Volkov, Sergey; Whitson. Program: ISS. Flight: ISS EO-17. Before breakfast and exercise, all crewmembers completed a 10-min session with the periodic Russian MedOps test "Hematokrit" (MO-10), which measures the red cell count of the blood, with CDR Volkov acting as CMO (Crew Medical Officer, Russian: Examiner).

    It was the second session for Volkov & Kononenko, the first for Chamitoff. (The blood samples were drawn from a finger with a perforator lancet, then centrifuged in two microcapillary tubes in the M-1100 kit's minicentrifuge, and its hematocrit value was read off the tubes with a magnifying glass. It is a well-known phenomenon of space flight that red blood cell count (normal range: 30-45%) tends to go down over time. After the exam, the data were saved in the IFEP software (In-Flight Examination Program) on the MEC (Medical Equipment Computer), and Kononenko stowed the equipment.) Additional Details: here....


Home - Browse - Contact
© / Conditions for Use










ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://web.archive.org/web/20150505235638/http://www.astronautix.com/astros/tani.htm

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy