Content-Length: 122590 | pFad | https://www.duluthharborcam.com/2017/12/james-r-barker-arrived-duluth-12282017.html

Duluth Harbor Cam: James R Barker arrived Duluth 12/28/2017 - 4X speed

Thursday, December 28, 2017

James R Barker arrived Duluth 12/28/2017 - 4X speed



James R Barker arrived Duluth this morning to load iron pellets. The Barker had been stuck in ice on the St Mary's River for a bit.

The Barker's horn was not working, so I added it from a previous arrival. (love that horn)








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: https://www.duluthharborcam.com/2017/12/james-r-barker-arrived-duluth-12282017.html

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy