Ibbaluru metro station

Ibbaluru is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. The metro station is slated to become operational around June 2026.[2][3][4][5]

Ibbaluru
Namma Metro station
General information
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line Red Line (Proposed)
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Side platform (TBC)
Platform-3Hebbala
Platform-4Sarjapura
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
Status  Under Construction
  Proposed
Station codeBLDR (TBC)
History
Opening  June 2026; 16 months' time (June 2026) (TBC)
  2030; 5 years' time (2030) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Agara Blue Line
(Future Service)
Bellandur
Agara
towards Hebbala
Red Line
(Proposed)
Bellandur Gate
towards Sarjapura
Location
Map

History

edit

Blue Line

edit

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 8.377 km Reach 2A – Package 2 (Kodibeesanahalli - Krishnarajapura) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station Layout

edit

Station Layout - To Be Confirmed

Ibbaluru track layout (TBC)
 
 
 
 
P#
 
 
 
P#
 
 
 
 
Station with two tracks and two side platforms
** Under Construction & Approved
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left  
Platform #
Westbound
Towards → KIAL Terminals
Next Station: Bellandur
Platform #
Eastbound
Towards ← Central Silk Board
Next Station: Agara
Change at the next station for Red Line
Side Platform | Doors will open on the left  
L2

Red Line Station Layout - To Be Confirmed

Ibbaluru track layout (TBC)
 
 
 
 
P#
 
 
 
P#
 
 
 
 
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform #
Northbound
Towards → Hebbala
Next Station: Agara
Change at the next station for Blue Line
Platform #
Southbound
Towards ← Sarjapura
Next Station: Bellandur Gate
Side platform | Doors will open on the left  
L2

Connections

edit

Entry/Exit

edit

See also

edit

References

edit
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. ^ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy