Line 4 (São Paulo Metro)

Line 4 (Yellow) (Portuguese: Linha 4–Amarela) is one of the six lines that make up the São Paulo Metro and one of the thirteen lines that make up the São Paulo Metropolitan Rail Transportation Network. Originally called Southeast-Southwest Line, the line goes from Vila Sônia to Luz and currently has 11 stations along its 12.8 km (8.0 mi) and transports around 800,000 users/day.[2] It is one of the most modern subway lines in Latin America and the first line in the region to utilize driverless trains and platform screen doors in all stations. [3]

São Paulo Metro Line 4 (Yellow)
São Paulo Metro ViaQuatro logo
Overview
StatusOperating
OwnerGovernment of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
  • Current:
  • Future:
  • Planned:
Stations11 in operation
2 in project
Websitewww.viaquatro.com.br
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) ViaQuatro (CCR)[1]
Depot(s)
  • Vila Sônia rail yard
  • Paulista train park
Rolling stock
History
Commenced2004
OpenedMay 25, 2010
Last extensionDecember 17, 2021
Technical
Line length12.8 km (8.0 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[1]
Electrification1,500 V DC catenary[1]
Operating speed80 km/h (50 mph)
SignallingSiemens Trainguard MT CBTC
Route map

Luz
República
Higienópolis–Mackenzie
Paulista train park
Paulista–Pernambucanas
Oscar Freire
Fradique Coutinho
Faria Lima
Pinheiros
Butantã
São Paulo–Morumbi
Vila Sônia rail yard
Vila Sônia–
Professora Elisabeth Tenreiro
Down arrow Planned
Chácara do Jockey
Taboão da Serra
Vila Sônia–Taboão da Serra free shuttle bus
Vila Sônia Bus Terminal
Largo do Taboão Bus Terminal

Due to fiscal constraints, the construction of the line was divided into two phases: The phase one was completed in 2011 and the phase two was partially inaugurated between 2014 and 2018 and was fully completed by 2021.[4]

Now completed, Line 4 - Yellow goes from Vila Sônia to Luz station, in a 12.8 km (8.0 mi) long stretch. It was expected that the line would be fully completed by 2014. However, the deadline has been repeatedly pushed back and completion was only completed in 2021. It is operated by ViaQuatro, a private company which won the public-private partnership to operate Line 4 for 30 years, which can be renewable for another 30 years.[1] Companhia do Metropolitano de São Paulo, the company operates some other lines in the São Paulo Metro, monitors the operation of the line.

History

edit

Conception

edit

Conceived since the years 1940s, the route of Line 4-Yellow was present in all studies for deployment of the Metro in São Paulo since. This road was consolidated in 1968 when the initial studies for the implementation of the current subway network, receiving at that time, the name of Southeast-Southwest Line. In parable form, would connect the neighborhoods of Pinheiros and Sacomã, from Jóquei Clube station to Via Anchieta station, through the Downtown, cutting East-West line of the Metro in República and Pedro II stations. Integration platforms came to be built in those two stations, but were not used. The Republic station platforms, built in the 1980s, with a further configuration of line 4, would be demolished for the passage of the tunneling machine, equipment that built the tunnel of Line 4 between Faria Lima and Luz stations, those from Pedro II station became a depôt. The consolidation of the project was only in 1993, when the basic design was first developed, already no longer including the Southeast portion, embedded in other policies of the Metro expansion and improvement of commuter trains.[citation needed]

Even in the 1990s, the Metro considered taking Line 4 to Tatuapé station, with the intent to relieve the Line 3-Red. This idea was discarded, having been replaced by a possible expansion of the Line 2-Green until that section. The construction of the Expresso Tiradentes (formerly Fura-Fila), designed in the administration of mayor Celso Pitta and the first section delivered in 2007, further reinforced the intention to build Line 4 only in the vector southwest of the city, from Luz Station.[citation needed]

Construction

edit

Construction was carried out in several phases, with trains initially operating from Luz to Butantã in Phase 1 with six stations, followed by five more stations and the full run from Luz to Vila Sônia in Phase 2.[1]

On January 12, 2007, during the construction of Pinheiros station, a large part of the site's access tunnel collapsed, opening an 80 m (265 ft) diameter crater, killing seven people. Several houses and vehicles were swallowed by the hole, including a minibus; four of the victims were inside. A lot more houses suffered heavy damage, with several of these being declared condemned. Following Pinheiros' accident, Época magazine, aside Rede Globo, made a series of revelations about the security of the other line's stations, then still in building stage, dispensing special attention to the Paulista station, at Consolação quarter, a more heavily populated area, where a crater like that would have claimed a lot more lives. The line's works were kept paralysed for about two months. Because of the press' accusations, the timetable was delayed for about four months, and Pinheiros construction could only be resumed after the end of the analysis procedures designed to discover the accident's cause. The reports were delivered in August, 2008, representing a delay of almost two years on the station's works. After work on the line resumed, two teams were digging the tunnel (one from each end, planning to meet in the middle).[citation needed]

As the two tunnels ("Caxingui" and "Três Poderes") approached their meeting point, a horizontal error of 80 cm (31 in) between the two was discovered. The error was reported on 12 September 2007, and was caused by an error in topography. ViaQuatro said that there would be no delay or cost overruns due to this error.[5]

In 2009 the Brazilian Federal Police opened an investigation into Camargo Corrêa enterprises about 14 of their construction works, including Line 4, as part of Operação Castelo de Areia ("Operation Sand Castle") looking into potential bribes paid to politicians.[6]

During April 2010, at the site of São Paulo-Morumbi station, a 30 m (98 ft) crane fell while hoisting building material from the bottom of the site. The crane fell across the pavement of Ave Prof. Francisco Morato; there were no injuries and work was not interrupted.[citation needed]

The first stretch, between and Faria Lima and Paulista stations, opened on May 25, 2010. Four other stations, Butantã, Pinheiros, República and Luz were opened in 2011.

Operation

edit

The line is the first completely driverless heavy-capacity metro in Latin America,[7] where trains normally operate without drivers at the front; the space normally reserved for the cab has been replaced with extra passenger space and windows for passengers to look out.

The line uses standard gauge with a width of 1,435 mm (4 ft 8+12 in), and an overhead catenary power supply electrified at 1500 V DC (the only other line to use overhead catenary is line 5). This line is the first in São Paulo where all stations have platform screen doors, which would be later incorporated into all newly-opened stations and lines on the network. The trains use communications-based train control driverless technology, allowing them to operate with a distance of one train length apart when necessary.[1] The entire line supports the reception of cellular signals, while there were originally plans to introduce Wi-Fi but have since been abandoned.

Contract

edit

Built within the framework of a public–private partnership, line 4 of the São Paulo metro is operated and maintained, for a duration of 30 years, by the "ViaQuatro" concessionnaire through a contract awarded by the São Paulo state. ViaQuatro's shareholders are Companhia de Concessões Rodoviárias (CCR) at 75%, RuasInvest Participações at 15% and Mitsui & Co at 10%.[8][9] For the establishment of operating rules, training, start-up and the launch of revenue service, ViaQuatro has benefitted from technical assistance by the Paris-based RATP Group through its subsidiary RATP Dev who held 1% of ViaQuatro shares until 2015.[10]

Rolling stock

edit

29 six-trains manufactured by Hyundai Rotem (i.e. a total of 174 cars) are used on the line. The length of each trainset is 128 metres (419 ft 11 in), and their capacity is 1,946 passengers, of which 306 are seated, a 25% increase from previous lines. The compositions, built in South Korea, have the driverless system, the first in Latin America, which allows the operation of the train without a driver.[11] The cars are all interconnected by articulated corridors and also have air conditioning system. Initially, it was estimated that they would have cell phone signal and wireless internet access,[11] but the Wi-Fi proposal was discarded and the cellular connection took months to be available on the line.

Route

edit
Code Station Platforms Position Connections District
LUZ Luz Side platforms Underground    
        
Bom Retiro
REP República     República
HIG Higienópolis–Mackenzie     (Future) Consolação
PTA Paulista–Pernambucanas    
  Campo Limpo–Rebouças–Centro Bus Corridor
FRE Oscar Freire    16  (Planned)
  Campo Limpo–Rebouças–Centro Bus Corridor
Jardim Paulista
FRA Fradique Coutinho    20  (Planned) Pinheiros
FAL Faria Lima -
PIN Pinheiros    
  Pinheiros Bus Terminal
BUT Butantã     Butantã Bus Terminal
  Itapevi–Butantã Metropolitan Corridor
Butantã
MBI São Paulo–Morumbi     (Planned)
    Morumbi Bus Terminal
  Campo Limpo–Rebouças–Centro Bus Corridor
Morumbi
VSO Vila Sônia–Professora Elisabeth Tenreiro     Vila Sônia Bus Terminal
  Campo Limpo–Rebouças–Centro Bus Corridor
    Vila Sônia–Taboão da Serra free shuttle bus
Vila Sônia
TBA Chácara do Jockey   Campo Limpo–Rebouças–Centro Bus Corridor
Taboão da Serra     Taboão da Serra Bus Terminal (Planned) Parque Santos Dumont (Taboão da Serra)

See also

edit

References

edit
  1. ^ a b c d e f Ferreira, Robert; Tharcisiu Alves. (January 2012). "São Paulo Metro". www.nycsubway.org. Retrieved 4 March 2017.
  2. ^ "Sobre a ViaQuatro | ViaQuatro".
  3. ^ "Diferenciais | ViaQuatro".
  4. ^ Santiago, Tatiana (17 December 2021). "Estação Vila Sônia, da Linha 4-Amarela, é inaugurada com 7 anos de atraso". G1 (in Portuguese). Retrieved 22 January 2022.
  5. ^ "Metrô: erro é 'incompatível' com estágio atual da engenharia" (in Brazilian Portuguese). G1. 20 September 2007. Retrieved 4 March 2017.
  6. ^ "Procuradoria pede investigações sobre diretores de construtora e obras do Rodoanel" (in Brazilian Portuguese). 7 December 2009.
  7. ^ "Tecnologia | ViaQuatro".
  8. ^ "Estrutura Acionária" (in Portuguese). Retrieved 2018-04-16.
  9. ^ Initially, the shareholder structure was different and structured as follows: Companhia de Concessões Rodoviárias 58%, Montgomery Participações Sa (30%), Mitsui & Co 10%, RATP Dev 1%, Benito Roggio Transporte 1%.
  10. ^ "CCR exerce direito de compra de participação da RATP na ViaQuatro" (in Portuguese). 2015-10-23. Archived from the original on 2015-10-24. Retrieved 2018-03-29.
  11. ^ a b "Novos trens da Linha 4 - Amarela do Metrô de SP operarão sem condutor; veja imagens". UOL Notícias (in Brazilian Portuguese). 10 November 2009. Retrieved 4 August 2023.
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy