Jump to content

Amdjarass Wind Farm

From Wikipedia, the free encyclopedia

Amdjarass Wind Farm
CountryChad
LocationAmdjarass, Ennedi-Est
StatusOperational
Commission date2016
Power generation
Units operational4 X 275 kW
Nameplate capacity1.1 MW

The Amdjarass Wind Farm is a 1.1 MW wind farm in Amdjarass, Ennedi-Est, Chad. It is the first wind farm in the country.

History

[edit]

The wind turbines were erected in February 2016. It was then followed by the installation of its energy storage systems, generators and transmission line.[1] The wind farm was finally commissioned by end of 2016, making it the first wind farm in Chad.[2]

Technical specifications

[edit]

The wind farm consists of four 275 kW wind turbines.[2] It was constructed by Vergnet.[1][3]

See also

[edit]

References

[edit]
  1. ^ a b "France's Vergnet installs 4-turbine wind park in Chad". Renewables Now. 8 August 2016. Retrieved 17 January 2024.
  2. ^ a b "Chad's first wind farm could be operational by 2025". Reve. 31 May 2022. Retrieved 17 January 2024.
  3. ^ Whitlock, Robin (10 August 2016). "Phase 1 of Chad's Amdjarass wind farm now complete". Renewable Energy Magazine. Retrieved 17 January 2024.

pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy