Jump to content

BMT Broadway Line

Route map:
From Wikipedia, the free encyclopedia

BMT Broadway Line
"N" train "Q" train "R" train "W" train
The N, Q, R, and W, which use the Broadway Line through Midtown Manhattan, are colored yellow.
Overview
StatusOperational
OwnerCity of New York
LocaleManhattan, New York City, New York
Termini
Stations16
Service
TypeRapid transit line
SystemNew York City Subway
Operator(s)New York City Transit Authority
Daily ridership445,799[1]
History
OpenedApril 9, 1917; 107 years ago (1917-04-09)
Technical
CharacterUnderground
Track gauge4 ft 8+12 in (1,435 mm)
Electrification600V DC third rail
Route map

Lexington Avenue–59th Street
Fifth Avenue–59th Street
57th Street–Seventh Avenue
49th Street
Times Square–42nd Street
34th Street–Herald Square
28th Street
23rd Street
14th Street–Union Square
Eighth Street–New York University
Prince Street
Canal Street
City Hall
(lower level storage tracks)
Cortlandt Street
Rector Street
Whitehall Street–South Ferry
Legend

Express station
Local station

The BMT Broadway Line is a rapid transit line of the B Division of the New York City Subway in Manhattan. As of November 2016, it is served by four services, all colored yellow: the N and ​Q trains on the express tracks and the R and ​W trains on the local tracks during weekdays (the N and Q trains make local stops during late nights, as do the N and R trains on weekends). The line is often referred to as the "N and R",[2][3] since those were the only services on the line from 1988 to 2001, when the Manhattan Bridge's southern tracks were closed for rebuilding. The Broadway Line was built to give the Brooklyn Rapid Transit Company (later the Brooklyn–Manhattan Transit Corporation, or BMT) access to Midtown Manhattan.

The line is named for its location under Broadway between Vesey Street and Seventh Avenue/45th Street (Times Square). It also passes under Vesey Street, Whitehall Street, Trinity Place, and Church Street in Lower Manhattan, and Seventh Avenue, 59th Street, and 60th Street in Midtown. The local tracks stretch the entire length between the two East River tunnels: the Montague Street Tunnel to the BMT Fourth Avenue Line in Brooklyn and the 60th Street Tunnel to the BMT Astoria Line and 60th Street Tunnel Connection in Queens. Center express tracks exist between Canal Street and 57th Street, turning off at Canal Street to feed the south tracks on the Manhattan Bridge, and continuing north and east under Central Park as the IND/BMT 63rd Street Line (connecting with the Second Avenue Subway). The Broadway Line was the only Manhattan outlet north of Delancey Street for the BMT's Brooklyn lines until 1967, when the opening of the Chrystie Street Connection allowed most BMT Brighton Line and BMT West End Line service to be moved to the IND Sixth Avenue Line.

Description and service

[edit]

The following services use the Broadway Line[4] and are colored yellow:

Route Services
  Time period South of
Whitehall St
Between
Whitehall St
and Canal St
Canal St
via Bridge
Between
Canal St
and 42 St
49 St
and
57 St
Between 57
St and
Lexington Ave
"N" train Weekdays no service express local
Weekends no service local
Nights local no service local
"Q" train All times except nights no service express no service
(diverges north of 57 St)
Nights no service local no service
(diverges north of 57 St)
"R" train All times except nights local no service local
Nights local no service
"w" train Weekdays local
rush hours
local no service local
Fifth Avenue–59th Street station

The BMT Broadway Line begins at the 60th Street Tunnel from Queens. The N and W trains from the BMT Astoria Line and the R service from the IND Queens Boulevard Line join at the beginning of the tunnel. The line runs west as a two-track subway line under 60th Street (east of Fifth Avenue) and 59th Street (west of Fifth Avenue), with stations at Lexington Avenue/59th Street and Fifth Avenue/59th Street. It then turns south to Seventh Avenue into the 57th Street–Seventh Avenue station.[5]

At the 57th Street station, the line joins two express tracks that enter the station from the north via the BMT 63rd Street Line, which the Q uses (with rush hour service from the N and R).[6] The line proceeds as a four-track subway down Seventh Avenue to its intersection with Broadway at Times Square-42nd Street, and then continues down Broadway to a point north of Canal Street, where the express tracks carrying the N and Q services descend and turn sharply east to separate platforms from the local tracks, before crossing the south side of the Manhattan Bridge to go to Brooklyn.[5]

Immediately after Canal Street, the express tracks resume again (originally they had been intended to run through) and serve as storage and turning tracks, bypassing the Canal Street local station and ending in the disused lower level of City Hall. The local tracks continue south as a two-track subway to Whitehall Street–South Ferry station. Whitehall Street–South Ferry is a three track, two-platform station, with the center track set up as a terminal track for the W train during weekdays, and late night R trains. A pair of bellmouths exists here, allowing for a connection to a never-built East River tunnel south of the Montague Street Tunnel that would have connected to Atlantic Avenue in Brooklyn.[7] It has been proposed to use this as part of the Lower Manhattan–Jamaica/JFK Transportation Project, connecting to the Court Street station (New York Transit Museum) in Brooklyn.[8][9]

The BMT Broadway Line then curves east carrying the R train to a trailing non-revenue connection with the BMT Nassau Street Line (no regular service) and enters the Montague Street Tunnel to Brooklyn.[5]

Unused sections and provisions

[edit]

Because of the complicated history, the Broadway Line includes several remnants of earlier plans. The line was built as four tracks south to City Hall, where the local tracks were to terminate on the upper level, and the express tracks were to use the lower level, curving through Vesey Street into Church Street. However, the final plan had the express tracks splitting at Canal Street and passing under the northbound local track to the Manhattan Bridge. The tracks via Canal Street and the Manhattan Bridge were not intended to be connected to the Broadway Line. Instead, they were supposed to be a crosstown line continuing further west. The tracks were connected to the Broadway Line as it allowed through operation between the Broadway Line and the Fourth Avenue Line in Brooklyn to go into operation more than a year earlier than would otherwise have been possible.[10] From the Canal Street Bridge station, it is possible to see where the line would have continued further west to a terminal near the Hudson River. At the Canal Street local station, the express tracks terminate part of the way into the station, more evidence of the change of plans. The tunnel south of City Hall was rebuilt to bring the upper local tracks down to the lower level north of Vesey Street, and the lower level at City Hall was never used for passenger service. The lower level is currently used for train storage.[7][11][12][13]

Unused construction is also present near the west end of the Queensboro Bridge. The original plan there was to build two one-track tunnels under 59th and 60th Streets east of Fifth Avenue, rising onto the bridge to Queens.[14] On July 28, 1915, the New York Public Service Commission approved a change of plans requested by the New York City Board of Estimate to place both tracks under 60th Street and cross the East River in the 60th Street Tunnel,[15] because of concern whether or not the bridge could handle the weight of all-steel subway trains. A piece of the 59th Street tunnel had already been built, concurrent with the construction of the IRT Lexington Avenue Line, and became a walkway connecting the two side platforms of the IRT's 59th Street station.[12][16]

The 60th Street Tunnel getting weekend track work

North of 57th Street, provisions were built to extend the four tracks northwest through Central Park and under Eighth Avenue through the Upper West Side to Inwood, along the route later built as the IND Eighth Avenue Line. The provision existed for many years and would have allowed for a grade-separated junction, allowing Broadway service via 59th Street and Eighth Avenue to coexist.[17]: 253  The provisions from two express tracks were connected to the BMT 63rd Street Line in 1989. The provisions from the two local tracks remain unused.[7][18]

South of the Whitehall Street station, provisions were built to allow for two tunnels to Atlantic Avenue in Brooklyn.[17]: 284 

History

[edit]

Planning

[edit]

New York City's first subway line, operated by the Interborough Rapid Transit Company (IRT), ran along Broadway in Lower Manhattan and Upper Manhattan, but it detoured away from Broadway between New York City Hall and Times Square.[19]: 139–161  John B. McDonald, the contractor who built the first subway line, had considered constructing a subway line under part of the remaining portion of Broadway as early as April 1902. The line would have run between Union Square and Times Square, merging with the IRT's subway line north of Times Square.[20] In July 1902, McDonald and the IRT's president August Belmont Jr. unsuccessfully proposed a line under Broadway between Union Square and Times Square for $100,000.[21][22] The Brooklyn Daily Eagle reported that, if the New York City government had accepted Belmont and McDonald's proposal, the government could lose $150,000 in annual income from the streetcar companies that used Broadway.[23]

The New York Public Service Commission adopted plans for what was known as the Broadway–Lexington Avenue route on December 31, 1907. This route began at the Battery and ran under Greenwich Street, Vesey Street, Broadway to Ninth Street, private property to Irving Place, and Irving Place and Lexington Avenue to the Harlem River. After crossing under the Harlem River into the Bronx, the route split at Park Avenue and 138th Street, with one branch continuing north to and along Jerome Avenue to Woodlawn Cemetery, and the other heading east and northeast along 138th Street, Southern Boulevard, and Westchester Avenue to Pelham Bay Park. In early 1908, the Tri-borough plan was formed, combining this route, the under-construction Centre Street Loop Subway in Manhattan and Fourth Avenue Subway in Brooklyn, a Canal Street subway from the Fourth Avenue Subway via the Manhattan Bridge to the Hudson River, and several other lines in Brooklyn.[24][25] A list of stations on the Broadway–Lexington Avenue line were announced in 1909. The plans tentatively called for a super-express service with stops at Warren or Murray Street and at Canal Street in Lower Manhattan, running non-stop to 86th Street and 125th Street in Upper Manhattan.[26][27]

The BRT proposal

The Brooklyn Rapid Transit Company (BRT) submitted a proposal to the Commission, dated March 2, 1911, to operate the Tri-borough system (but under Church Street instead of Greenwich Street), as well as a branch along Broadway, Seventh Avenue, and 59th Street from Ninth Street north and east to the Queensboro Bridge; the Canal Street subway was to merge with the Broadway Line instead of continuing to the Hudson River.[28][29] The IRT initially opposed the BRT's plans to operate a subway line under Broadway in Manhattan, as the IRT wanted to operate the line itself, but the BRT persisted.[30] In May 1911, the IRT proposed constructing a two-track line extending from Lafayette Avenue in Brooklyn, which would cross the East River into Manhattan and travel west under 14th Street, north under Broadway, and east under 59th Street to the Queensboro Bridge.[31][32] The BRT refused to accept this offer.[33] The city, the BRT, and the IRT reached an agreement and sent a report to the New York City Board of Estimate on June 5, 1911. The line along Broadway to 59th Street was assigned to the BRT, while the IRT obtained the Lexington Avenue line, connecting with its existing route at Grand Central–42nd Street.[34][35] The New York City Board of Estimate approved the report on June 21.[36][37] The Public Service Commission approved a proposal in March 1912 to connect the line with the proposed Montague Street Tunnel at its southern end.[38] The Dual Contracts, two operating contracts between the city and the BMT and IRT, were adopted on March 4, 1913.[39]

Before construction started, the plans for the Broadway Line's stations in midtown were changed several times. Originally, there was going to be an express station at 47th Street, and there would have been local stations at 42nd and 57th Streets.[40] In December 1913, the plans were changed so that both 47th and 57th Streets were express stations, and the local stop at 42nd Street was relocated to 38th Street.[41] Opponents of the plan said it would cause large amounts of confusion, as Times Square was a "natural" transfer point.[42] In February 1914, the PSC ordered the BRT to make the Broadway Line's 42nd Street station an express station.[43][44] In addition, 57th Street became an express station, while there was to be a local station at 49th Street.[7] The change was made at the insistence of Brooklynites who wanted an express station in the Theater District of Manhattan.[45]

Construction

[edit]

Work south of 14th Street

[edit]

The first part of the Broadway Line to be built was the section south of 14th Street, which was initially known as the Broadway–Lexington Avenue Line.[46] In January 1912, the Underpinning & Foundation Company received a $2.295 million contract to construct section 3 of the line, from Howard Street to Houston Street, which included the Prince Street station.[47][48] The same month, the Degnon Construction Company submitted a low bid for the construction of section 2 of the Broadway–Lexington Avenue Line, from Park Place to Walker Street (two blocks south of Howard Street), for $2.356 million; this segment included the City Hall station.[49] The Canal Street station was to be built as part of section 2A, between Walker and Howard Streets, which was placed for bid in March 1912. The O'Rourke Engineering Construction Company submitted a low bid of about $910,000 for section 2A.[50][51]

In September 1912, F. L. Cranford received about $2 million in construction contracts for sections 1 and 1A in Lower Manhattan. By then, the Public Service Commission had decided to divide the Broadway–Lexington Avenue Line between the BRT and the IRT; as such, the commission canceled plans for sections 5 and 6 of the Broadway–Lexington Avenue Line, which paralleled the existing IRT line.[52] During construction, workers discovered the remnants of a tunnel for the Beach Pneumatic Transit near City Hall,[46] as well as the remains of a 17th-century colonial prison near Dey Street.[53]

In May 1913, the Public Service Commission began receiving bids for section 4 of the Broadway–Lexington Avenue Line, between Houston Street and Union Square, which was to include the Eighth Street and 14th Street stations. This was the first construction contract to be placed for bidding after the Dual Contracts had been signed.[54] The Dock Contractor Company submitted a low bid of $2.578 million,[55][56] but local civic group Broadway Association and various property owners objected to the fact that Dock Contractor was to receive the contract, citing the firm's lack of experience.[57][58] The Public Service Commission approved Dock Contractor's bid despite these objections,[59] and the contract was awarded later that month.[60] By the end of the year, work on the tunnel south of 14th Street was running ahead of schedule. Section 3 was 78 percent complete, while section 4 was 71 percent complete.[61] These sections were more than 80 percent complete by March 1914; work on the City Hall station was so far advanced that contractors had begun installing subway entrances.[62]

Canal Street spur

[edit]

By February 1914, the Public Service Commission was soliciting bids for a tunnel extending east under Canal Street to the Manhattan Bridge. Due to the swampy character of the area (which used to contain a drainage canal from Collect Pond), the commission considered building the line using either the cut-and-cover method or using deep-bore tunneling.[63] The Underpinning and Foundation Company submitted a low bid of $1.822 million for a cut-and-cover tunnel.[64][65] The Canal Street tunnel was originally supposed to be a separate line passing under the Broadway Line station and extend further westward.[65][66] At the time, the Public Service Commission did not plan to build a track connection between the Canal Street and Broadway lines, saying that such a connection would cause severe train congestion. The BRT wanted to connect the lines, citing the fact that it would be difficult for passengers to transfer at the Canal Street station or to reroute trains in case of emergency.[66] East of Centre Street, the Canal Street line had four tracks, although the southern two tracks turned south onto the Centre Street Loop.[67]

Work on the Canal Street line proceeded slowly,[68] in part because of the high water table of the area, which required the contractor to pump out millions of gallons of groundwater every day.[65][69] Plans for the Canal Street line west of Broadway were abandoned midway during construction, and the Canal Street line was connected to the Broadway Line instead.[65] The Canal Street spur was less than half completed by January 1916 and was not planned to be opened for another fourteen months.[70] By then, the sections of the mainline Broadway Line south of 26th Street were between 88 and 99.7 percent finished.[70][71] Real-estate figures wanted the completion of the Canal Street spur to be expedited so the Broadway Line could be opened,[72] and they claimed that the city's failure to open the Broadway Line would result in a loss of profit for the BRT.[71][73]

Work north of 14th Street

[edit]

The route north of 14th Street was originally considered a separate line, the Broadway Line, which tied into the Broadway–Lexington Avenue Line south of 14th Street.[46] The Public Service Commission began soliciting bids for section 1 of the Broadway Line from 16th to 26th Streets, which included the 23rd Street station, in July 1913.[74] This segment was awarded to the E. E. Smith Construction Company that September.[75] By early 1914, contracts had been let for all segments from Whitehall Street to 26th Street.[76] The Public Service Commission approved plans for the segment between 26th and 38th Streets, including the 28th Street and 34th Street stations, in April 1914.[77][14] The contract for that section went to the second-lowest bidder, the United States Realty and Construction Company, as the lowest bidder was too inexperienced.[78] U.S. Realty began constructing the tunnel between 26th and 38th Streets in August 1914.[79]

By the end of 1914, contracts had been awarded for all sections south of 38th Street,[68][79] but the section north of 38th Street was delayed due to disputes over the layout and placement of the 42nd Street station.[68] In particular, the Public Service Commission was supposed to have awarded a contract for the portion between the intersection of 38th Street and Broadway, and the intersection of 59th Street and Seventh Avenue.[68] No contract for this section of the line had been awarded by early 1915 because plans for the line north of 59th Street were in dispute.[73] The section between 38th Street and 51st Street, known as section 3,[80][81] was not put to bid until July 1915.[81][82] This section was to include the Times Square–42nd Street and 49th Street stations.[83] Holbrook, Cabot & Rollins Inc. submitted a low bid of $3.741 million for that section of the line.[80][83]

Completion

[edit]

The Broadway Line was originally supposed to open at the beginning of 1917. However, the line's opening had to be postponed by mid-1915, as none of the connections to other subway lines were close to finished.[84] The Broadway Line south of 14th Street was substantially complete by February 1916.[85][86] The same month, the Public Service Commission began accepting bids for the installation of finishes at seven stations on the Broadway Line from Rector Street to 14th Street,[85][86] and D. C. Gerber submitted a $346,000 low bid for the finishes.[87] At the time, work on the section of the line north of 14th Street had not advanced as far as the section to the south, and the BRT blamed the city government for delays in opening the line.[88] By that October, stations between Morris Street (in Lower Manhattan) and 14th Street were 35 percent completed.[89] A. W. King was hired to install finishes in the 34th Street and Times Square stations in July 1917.[90]

The Public Service Commission indicated in February 1917 that it was prepared to force the BRT to open the section of the line between Canal Street and 14th Street, even though the BRT wished to wait until the Times Square station was completed.[91] That year, the IRT and BRT reached an agreement in which the Broadway Line would receive power from the IRT Powerhouse.[92][93] At the end of August 1917, the BRT's parent company, the New York Consolidated Railroad Company, applied to the Public Service Commission for permission to open the line from Canal Street to 14th Street.[94] The opening of the line was expected to reduce congestion at Chambers Street, where many BRT passengers had previously transferred to the IRT and paid an extra fare to go uptown.[95]

Opening

[edit]
An R train of R46 cars at 57th Street

A short portion of the line, coming off the north side of the Manhattan Bridge through Canal Street to 14th Street–Union Square, opened on September 4, 1917, at 2 P.M., with an eight car train carrying members of the Public Service Commission, representatives of the city government and officials of the BRT, leaving Union Square toward Coney Island. Service opened to the general public at 8 P.M., with trains leaving Union Square and Coney Island simultaneously.[96][97] The line was served by two services. One route ran via the Fourth Avenue Line and the Sea Beach Line to Coney Island;[98] this service was rerouted from its previous terminus at Chambers Street.[99] The other line ran to Ninth Avenue, where passengers could transfer for West End and Culver Line service.[98] The initial headway on the line was three minutes during rush hours, three minutes and forty-five seconds at other times, except during late nights when service ran every fifteen minutes.[98] The opening of the Broadway Line's first segment caused real-estate prices to increase in parts of Brooklyn which had direct subway access to the new line.[100]

On January 5, 1918, the line was extended north to Times Square–42nd Street and south to Rector Street. Express service via the line began, with Sea Beach and West End trains that had been running local becoming expresses. The opening of this portion of the line provided additional transit service to Times Square, with a new connection to Brooklyn. Local service henceforth ran between Times Square and Rector Street.[101][102] While local trains terminated at the Times Square station, express trains from Brooklyn continued to terminate at Union Square until the northward extension to 57th Street was completed.[103][104] At the beginning of September 1918, trains on the line were lengthened from four to five cars.[105] Service was extended one station to Whitehall Street–South Ferry on September 20, 1918.[106][107]

The line was extended two stops northward to 57th Street on July 10, 1919.[107][108] Express service between Times Square and Union Square was inaugurated on this date. Previously, express service terminated at Union Square, with local service terminating at Times Square. Express service then began to terminate at Times Square, with local service terminating at the new 57th Street station. Express service between Manhattan and Pacific Street began to run at all times except late nights.[108] The line was extended to Lexington Avenue/59th Street on September 1, 1919.[107][109]

On August 1, 1920, the Broadway Line was extended on either end, with the opening of two tunnels under the East River. On the north end the line was extended through the 60th Street Tunnel to Queensboro Plaza, and on the south end the line was extended through the Montague Street Tunnel to DeKalb Avenue with service via the BMT Brighton Line. With these extensions, the Broadway Line was completed.[110][111]

Station modifications

[edit]

Platforms at stations on the Broadway Line originally could only fit six 67-foot-long (20 m) cars. The State Transit Commission first directed the BMT to lengthen platforms at these stations in September 1923, but the BMT declined to do so, citing workforce shortages.[112] In 1926, the New York City Board of Transportation (BOT) received bids for the lengthening of platforms at nine stations on the Broadway Line, from Whitehall Street to 23rd Street, to accommodate eight-car trains. Edwards & Flood submitted a low bid of $101,750 for the project.[113] The platform-lengthening project was completed in 1927, bringing the length of these stations' platforms to 535 feet (163 m).[114][112]

In the 1960s, the New York City Transit Authority (NYCTA) started a project to lengthen station platforms on the Broadway Line to 615 feet (187 m) to accommodate 10-car trains.[115] All stations on the Broadway Line had their platforms lengthened during this time.[116] The NYCTA also covered elaborate mosaic tile walls with 8-by-16-inch (20 by 41 cm) white cinderblock tiles at 16 local stations on the Broadway and Fourth Avenue lines. The latter project was criticized for being dehumanizing.[117] An NYCTA spokesman stated that the old tiles were in poor condition and that the change was made to improve the appearance of stations and provide uniformity. Furthermore, it did not consider the old mosaics to have "any great artistic merit".[117]

Chrystie Street Connection reconfiguration

[edit]

The Chrystie Street Connection was built during the 1960s. The new connection consisted of a pair of double-track tunnels connecting the IND Sixth Avenue Line south of the Broadway–Lafayette Street station with the Williamsburg Bridge and the Manhattan Bridge north tracks. The Broadway Line had previously been connected to the north tracks of the Manhattan Bridge. As part of the project, the Broadway Line was connected to the south tracks, which had been previously used by trains from the BMT Nassau Street Line. The connection between the south tracks and the Nassau Street Line was severed, and the connection between the Broadway Line and the north tracks was also severed. Many routes, including those on the Broadway Line, changed as a result of the opening of the connection on November 26, 1967.[118] The RR local was rerouted to Astoria, running 24/7 between Ditmars Boulevard and Bay Ridge–95th Street. To replace it in Queens, a new EE local was created, running between Forest Hills and Whitehall Street during weekdays. The Q, which was the only service via the Brighton Line, was converted to the rush-hour only QB, running express in Manhattan from 57th Street. Most of the trips were moved to the IND Sixth Avenue Line as a relocated D, but a few trips stayed as the QB. QT service was discontinued. Another rush-hours only express service, the NX, was created. It ran from 57th Street to Brighton Beach, following the N route, making express stops along the BMT Sea Beach Line, before going through Coney Island to terminate at Brighton Beach. NX service ended on April 12, 1968 due to low ridership.[12][119]

Brochure showing the elimination of double letters

At most times, the Broadway Line has had four services — two local and two express — during the day, with a third express service until the 1967 opening of the Chrystie Street Connection.

  • 1/QT (BMT Brighton Line) local trains ran until 1967, when the QT was discontinued. At that time, the EE was introduced, becoming part of the N in 1976; the N became express and the W became local in 2004.
  • 1/Q (BMT Brighton Line) express trains were mostly moved to the IND Sixth Avenue Line as a relocated D in 1967, but a few trips stayed as the QB, later the Q again. During the Manhattan Bridge reconstruction, from the 1980s until 2001, the Q mostly used the IND Sixth Avenue Line. When restored in 2001, the Q became full-time, replacing the D on the Brighton Line.
  • 2/RR (BMT Fourth Avenue Line) trains (later R) have run local over the Broadway Line since 1920.
  • 3/T (BMT West End Line) trains ran express on the Broadway Line until 1967, when the T became part of the realigned B via the IND Sixth Avenue Line.
  • 4/N (BMT Sea Beach Line) trains used the express tracks until the Manhattan Bridge reconstruction in the 1980s, when all N trips became local. (Some had run local since the EE was merged into the N in 1976.) When the Manhattan Bridge south tracks reopened in 2001, the W was introduced, at first running express; it became local in 2004, and the N moved back to the express tracks.

Several other services have used the express tracks, including the NX (Sea Beach, 1967–1968) and the B (West End) and D (Brighton) during closures of the Manhattan Bridge north tracks in the 1980s and 1990s.

On May 6, 1985, double letters were eliminated, and the QB was relabeled the Q, and the RR was relabeled the R.[120][121]

Manhattan Bridge reconstruction: 1986–2001

[edit]

On April 26, 1986, the north side tracks on the Manhattan Bridge leading to the IND Sixth Avenue Line were closed for rehabilitation, and services that had used the north side were moved to the south side, running via the BMT Broadway Line. Because of the large amount of train traffic now running on the bridge's south side tracks, rush hour and midday N service stopped using the bridge, and began running via the Montague Street Tunnel and Lower Manhattan making local stops. However, evening, night and weekend trains continued to use the bridge and express tracks, terminating at 57th Street–Seventh Avenue. B and D services were split. Their service from the Bronx and Upper Manhattan continued to run via the Sixth Avenue Line, terminating at 34th Street. Their service to Brooklyn, however, was rerouted via the Broadway Line express tracks. D service terminated at 57th Street, while B service terminated at Astoria-Ditmars Boulevard during rush hours, and at Queensboro Plaza during middays, evenings, and weekends.[122]

Between April 26, 1986 and May 24, 1987, the N ran express via the Bridge to 57th Street during evenings, nights, and weekends. Afterwards, N service began running local via the Broadway Line during evenings, nights, and weekends, but they still operated over the Manhattan Bridge. On May 24, 1987, when the N and R swapped routes in Queens, there were additional changes in Broadway service. Evening and weekend B service stopped switching to the local track north of 34th Street to serve the Astoria Line. Instead, it skipped 49th Street and terminated at 57th Street.[123][124]

When the north side of the Manhattan Bridge reopened on December 11, 1988, the south side of the bridge was closed. B, D, and Q trains were rerouted from the Broadway Line to the Sixth Avenue Line using the north side of the bridge. The N began running local in Manhattan and via the Montague Tunnel at all times. In order to replace B service to Ditmars Boulevard, additional N service was provided during rush hours.[125][126]

On September 30, 1990, express service on the Broadway Line was restored when repair work on the Manhattan Bridge was temporarily suspended. The N then began making express stops from 34th Street to Canal Street at all times except late nights. R service between Manhattan and Brooklyn was increased during rush hours. During late nights, R trains no longer ran via the Broadway Line; instead, they operated as a shuttle in Brooklyn, terminating at 36th Street.[124][127] The brief Broadway service via the Manhattan Bridge was stopped on December 27 because of a cracked beam on the bridge.[128][129][130]

A D train on the north side of the Manhattan Bridge, looking toward Brooklyn

From April 30, 1995 to November 12, 1995, the Manhattan Bridge services were supposed to go back to the 1986–1988 service pattern with only the south side Broadway Line tracks in service. However, the Broadway side was not yet ready. As a result, during middays and weekends, the north side of the bridge was also closed. As a result, Q trains began serving the Broadway Line again. They ran via the Montague Street Tunnel, before switching to the express tracks after Canal Street. This service continued past 57th Street via the BMT 63rd Street Line to 21st Street–Queensbridge, being the first scheduled service to use this connection.[131]

On February 22, 1998, construction on the IND 63rd Street Line cut B and Q service to 57th Street–Sixth Avenue. Service on the 63rd Street Line was replaced by a shuttle running from the BMT Broadway Line. Trains originally operated from 57th Street–Seventh Avenue to 21st Street–Queensbridge, with 20-minute headways. On April 6, 1998, because the service did not terminate at an ADA-accessible station, the shuttle was extended to 34th Street–Herald Square on weekdays, skipping 49th Street via the express tracks. Normal service resumed on May 22, 1999.[132][133]

2001–present

[edit]

The current set of four services — N, Q, R, and W — started using the line on July 22, 2001, when the south tracks on the Manhattan Bridge reopened and the Broadway B and D services were discontinued. At this time, the north-side tracks were closed.[134][135] Originally, the N ran local via the Montague Street Tunnel and the BMT Sea Beach Line, and the W ran express via the Manhattan Bridge and the BMT West End Line. On February 22, 2004, when the north tracks reopened, the N became express via the Manhattan Bridge and the W was short-turned at Whitehall Street, its Brooklyn section being replaced by the D.[136]

On June 25, 2010, because of a budget shortfall, service on the Broadway Line was reduced. The W train was discontinued and was replaced by N and Q service in Manhattan and Queens, respectively. The N train, which replaced the W, began running local north of Canal Street at all times, and the Q train was extended to/from Astoria, Queens via the 60th Street Tunnel in place of the W on weekdays, stopping on the local tracks starting at Times Square–42nd Street.[137] In December 2014, the Q began running local on the line between Canal Street and 57th Street–Seventh Avenue during late nights, to supplement late-night N service.[138]

A W train of R160 cars at Union Square

In early 2016, as part of the upcoming opening of the Second Avenue Subway's first phase, the MTA announced that the W service would resume operations.[139][140] On November 5, 2016, late-night R service was extended to Whitehall Street in order to reduce the need to transfer and provide a direct link to Manhattan. Two days later, W trains were reintroduced, running local on weekdays between Ditmars Boulevard and Whitehall Street. The N train once again became a weekday express in Manhattan between 34th Street–Herald Square and Canal Street.[141] Q trains terminated at 57th Street–Seventh Avenue at all times[139][140] until the first phase of the Second Avenue Subway opened on January 1, 2017, at which point the Q was extended along the Second Avenue Subway north of 57th Street.[142]

In 2024, as part of a program to upgrade the signaling of the New York City Subway, the MTA proposed installing communications-based train control (CBTC) on the Broadway Line and Manhattan Bridge spur as part of its 2025–2029 Capital Program.[143][144]

Station listing

[edit]
Station service legend
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops late nights only Stops late nights only
Stops late nights and weekends Stops late nights and weekends only
Stops weekdays during the day Stops weekdays during the day
Stops rush hours only Stops rush hours only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only
Time period details
Disabled access Station is compliant with the Americans with Disabilities Act
Disabled access ↑ Station is compliant with the Americans with Disabilities Act
in the indicated direction only
Disabled access ↓
Elevator access to mezzanine only
Neighborhood
(approximate)
Disabled access Station Tracks Services Opened Transfers and notes
begins as a merge of the BMT Astoria Line (N all timesW weekdays) and the 60th Street Tunnel Connection (R all except late nights) and
passes through the 60th Street Tunnel
Midtown Manhattan Lexington Avenue–59th Street local N all timesR all times except late nightsW weekdays only September 1, 1919[107][109] IRT Lexington Avenue Line (4 all times5 all times except late nights6 all times <6> weekdays until 8:45 p.m., peak direction)
Out-of-system transfer with MetroCard/OMNY: 63rd Street Lines (F all times <F> two rush hour trains, peak directionN limited weekday rush hour service onlyQ all timesR one a.m. rush hour trip in the northbound direction only) at Lexington Avenue–63rd Street
Roosevelt Island Tramway
Fifth Avenue/59th Street local N all timesR all times except late nightsW weekdays only September 1, 1919[107][109]
express tracks begin from the BMT 63rd Street Line (N limited weekday rush hour service onlyQ all timesR one a.m. rush hour trip in the northbound direction only)
Disabled access 57th Street–Seventh Avenue all N all timesQ all timesR all except late nightsW weekdays only July 10,

1919[107][108]

Disabled access ↑ 49th Street local N all timesQ late nights onlyR all except late nightsW weekdays only July 10,

1919[107][108]

Accessible northbound only
Disabled access Times Square–42nd Street all N all timesQ all timesR all except late nightsW weekdays only January 5, 1918[101] IRT Broadway–Seventh Avenue Line (1 all times2 all times3 all times)
IRT Flushing Line (7 all times <7> rush hours until 9:30 p.m., peak direction​)
42nd Street Shuttle (S all except late nights)
IND Eighth Avenue Line (A all timesC all except late nightsE all times) at 42nd Street–Port Authority Bus Terminal
IND Sixth Avenue Line (B weekdays during the dayD all timesF all times <F> two rush hour trains, peak directionM weekdays during the day) at 42nd Street–Bryant Park, daytime only
Port Authority Bus Terminal
Disabled access 34th Street–Herald Square all N all timesQ all timesR all except late nightsW weekdays only January 5, 1918[101] IND Sixth Avenue Line (B weekdays during the dayD all timesF all times <F> two rush hour trains, peak directionM weekdays during the day)
Penn Station: Amtrak, Long Island Rail Road, and New Jersey Transit
M34/M34A Select Bus Service
Connection to PATH at 33rd Street
NoMad 28th Street local N weekends and late nightsQ late nights onlyR all except late nightsW weekdays only January 5, 1918[101]
Flatiron District 23rd Street local N weekends and late nightsQ late nights onlyR all except late nightsW weekdays only January 5, 1918[101] M23 Select Bus Service
Union Square Disabled access 14th Street–Union Square all N all timesQ all timesR all except late nightsW weekdays only September 4, 1917[98] IRT Lexington Avenue Line (4 all times5 all times except late nights6 all times <6> weekdays until 8:45 p.m., peak direction)
BMT Canarsie Line (L all times)
M14A / M14D Select Bus Service
Greenwich Village Eighth Street–New York University local N weekends and late nightsQ late nights onlyR all except late nightsW weekdays only September 4, 1917[101]
SoHo Prince Street local N weekends and late nightsQ late nights onlyR all except late nightsW weekdays only September 4, 1917[101]
Chinatown Elevator access to mezzanine only Canal Street express
(lower level)
N all except late nightsQ all times September 4, 1917[101] IRT Lexington Avenue Line (4 late nights6 all times <6> weekdays until 8:45 p.m., peak direction)
BMT Nassau Street Line (J all timesZ rush hours, peak direction)
Express station originally known as Broadway
local
(upper level)
N late nightsR all except late nightsW weekdays only January 5, 1918[101]
express tracks continue into Brooklyn via Manhattan Bridge south tracks (N all except late nightsQ all times)
Civic Center City Hall local N late nightsR all except late nightsW weekdays only January 5, 1918[101]
Financial District Disabled access Cortlandt Street local N late nightsR all except late nightsW weekdays only January 5, 1918[101] IRT Broadway–Seventh Avenue Line (2 all times3 all except late nights) at Park Place
IND Eighth Avenue Line (A all timesC all except late nights) at Chambers Street
IND Eighth Avenue Line (E all times) at World Trade Center
Connection to PATH at World Trade Center
Rector Street local N late nightsR all except late nightsW weekdays only January 5, 1918[101]
Elevator access to mezzanine only Whitehall Street–South Ferry all N late nightsR all timesW weekdays only September 20, 1918[107] IRT Broadway–Seventh Avenue Line (1 all times)
M15 Select Bus Service
Staten Island Ferry at South Ferry
Southern terminal for W weekdays only service
merges with BMT Nassau Street Line (no regular service)
continues into Brooklyn via the Montague Street Tunnel and becomes the BMT Fourth Avenue Line (N late nights R all timesW limited rush hour service only)

References

[edit]
  1. ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  2. ^ Kennedy, Randy (October 31, 2000). "Honoring the Champions". The New York Times. p. B10. ISSN 0362-4331. And the only reason she was standing in the middle of Broadway was that she was below it. Underground. In the N and R subway station.
  3. ^ Saulny, Susan (December 5, 2000). "In Subway Changes, W Follows V, but for Riders It's Not So Simple". The New York Times. p. B1. ISSN 0362-4331. Archived from the original on May 31, 2019. Retrieved May 31, 2019. The Q, N, R and W trains would all run on N and R tracks in Manhattan.
  4. ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  5. ^ a b c Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  6. ^ * "N Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  7. ^ a b c d Report of the Public Service Commission of The First District of the State Of New York For The Year Ending December 31, 1915. New York State Public Service Commission. January 1, 1916.
  8. ^ Community Consulting Services, Inc. in association with George Haikalis, Transportation Consultant, "Better Transit for Brooklyn: A Proposal for a Brooklyn Transit Agenda" (PDF). Archived from the original (PDF) on July 1, 2007.  (2.46 MB), revised April 2003, page 49
  9. ^ Regional Rail Working Group, "East River Tunnel" (PDF). Archived (PDF) from the original on January 8, 2007. Retrieved April 13, 2007. (687 KB), page 4 (includes a map)
  10. ^ Report of the Public Service Commission for the First District of the State of New York. The Public Service Commission for the First District of the State of New York. 1918. p. 74.
  11. ^ Joseph Brennan, Abandoned Stations: City Hall (BMT) lower level Archived September 17, 2019, at the Wayback Machine, accessed March 21, 2007
  12. ^ a b c Cudahy, Brian J. (January 1, 1995). Under the Sidewalks of New York: The Story of the Greatest Subway System in the World. Fordham University Press. ISBN 978-0-8232-1618-5.
  13. ^ "BMT Broadway Line". www.nycsubway.org. Archived from the original on October 10, 2016. Retrieved November 6, 2016.
  14. ^ a b "Lines in Manhattan Progressing Rapidly". The Brooklyn Citizen. May 23, 1914. p. 14. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  15. ^ "Adopts Tunnel To Queens.; Service Board Approves Change in New Subway Route". The New York Times. July 29, 1915. ISSN 0362-4331. Archived from the original on May 4, 2022. Retrieved December 3, 2017.
  16. ^ Joseph Brennan, Abandoned Stations: Lexington Ave (BMT) unfinished platforms Archived February 12, 2017, at the Wayback Machine, accessed March 21, 2007
  17. ^ a b Assembly, New York State Public Service Commission (January 15, 1918). Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1917.
  18. ^ Transit Commission, New Subways: Proposed Additions to Rapid Transit System Archived April 24, 2007, at the Wayback Machine, 1922
  19. ^ Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  20. ^ "M'Donald for East Side Plan". New-York Tribune. April 8, 1902. p. 1. Archived from the original on May 1, 2023. Retrieved May 1, 2023.
  21. ^ "P. R. R. Franchise Rejected". New-York Tribune. July 23, 1902. p. 1. Archived from the original on May 1, 2023. Retrieved May 1, 2023.
  22. ^ "Brooklyn Tunnel Construction Bids; Rapid Transit Co. of That Borough Wants $8,000,000". The New York Times. July 22, 1902. ISSN 0362-4331. Archived from the original on May 1, 2023. Retrieved May 1, 2023.
  23. ^ "City Will Lose $150,000 a Year". The Brooklyn Daily Eagle. July 23, 1902. p. 6. Archived from the original on May 1, 2023. Retrieved May 1, 2023.
  24. ^ James Blaine Walker, Fifty Years of Rapid Transit, 1864–1917 Archived March 26, 2023, at the Wayback Machine, published 1918, pp. 207-223
  25. ^ Engineering News, A New Subway Line for New York City Archived July 5, 2012, at the Wayback Machine, Volume 63, No. 10, March 10, 1910
  26. ^ "Stations for New Subway; Tentative Plans Announced -- Few Express Stops, Permitting High Speed". The New York Times. July 21, 1909. ISSN 0362-4331. Archived from the original on May 16, 2023. Retrieved May 16, 2023.
  27. ^ "Stations on New Line: Tentative List on Broadway-lexington Avenue Subway Announced". New-York Tribune. July 21, 1909. p. 12. ISSN 1941-0646. ProQuest 572268569.
  28. ^ "New Plan for Subways: B. R. T. Offers to Equip and Operate City Built System". New-York Tribune. March 3, 1911. p. 5. ISSN 1941-0646. ProQuest 574742724.
  29. ^ "New Subway System Outlined by B.R.T.; Tunnel from Brooklyn, Tube Up Broadway to 59th Street and East to Williamsburg Bridge". The New York Times. March 3, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  30. ^ "B.R.T. Stands Firm for Broadway Line; Its Attitude Seems Likely to Bring an Early Determination of Subway Tangle". The New York Times. April 15, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  31. ^ "Interboro Makes New Offer; East, It Says: Ready to Spend $99,524,500 for Construction and Equipment of New Subways". New-York Tribune. May 10, 1911. p. 1. ISSN 1941-0646. ProQuest 574764906.
  32. ^ "New Interboro Subway Offer in; Would Spend $24,000,000 More and Yields on Matter of Elevated Extensions". The New York Times. May 10, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  33. ^ "Williams Attacks Subway Compromise; Tells BrooklynAudience That Deal with Interborough Now Would Be Dishonorable". The New York Times. May 18, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  34. ^ "B. R. T. And Interboro Meet in Warm Debate: Williams and Quackenbush Present Merits of Rival Subway Offer". New-York Tribune. June 6, 1911. p. 1. ISSN 1941-0646. ProQuest 574777243.
  35. ^ "City's Conferrees Agreed on Subways: Decide on Report to Be Submitted to Board of Estimate on Thursday". The New York Times. June 6, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  36. ^ "Adopt Subway Report by Unanimous Vote: Board of Estimate Gives B. R. T. And Interborough a Week to Prepare Replies Some Amendments Made Mcaneny Agrees to That Offered by Mitchel, to Which Miller Objects--P. S. C. Asked to Draw Up Contracts". New-York Tribune. June 22, 1911. p. 1. ISSN 1941-0646. ProQuest 574773115.
  37. ^ "M'Aneny Subway Report is Adopted; Board of Estimate Acts Unanimously and Gives Interborough and B.R.T. a Week to Reply". The New York Times. June 22, 1911. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  38. ^ "P. S. Board Adopts E. R. Tunnel Route". The Brooklyn Citizen. March 28, 1912. p. 1. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  39. ^ James Blaine Walker, Fifty Years of Rapid Transit, 1864–1917 Archived March 26, 2023, at the Wayback Machine, published 1918, pp. 224-241
  40. ^ "Station Sites for New Subways; Pamphlet Issued by Utilities Board Contains List of Stops on Dual System". The New York Times. July 6, 1913. ISSN 0362-4331. Archived from the original on February 13, 2023. Retrieved February 12, 2023.
  41. ^ "Station Spacing Favors Times Sq.; B.R.T. Plan Might Put Two Express Stops Above There in Seventh Avenue And Eight Blocks Apart Besides Leaving No Room for New Station Between 42d and 32d Streets on Broadway". The New York Times. December 2, 1913. ISSN 0362-4331. Archived from the original on July 14, 2018. Retrieved August 3, 2016.
  42. ^ "Times Sq. Natural Point of Transfer; Unless Express Station Is Put There, Great Confusion Will Result". The New York Times. December 3, 1913. ISSN 0362-4331. Archived from the original on February 12, 2023. Retrieved February 12, 2023.
  43. ^ "Make Times Square an Express Stop; Public Service Commission Will Put a Local Station at Forty-seventh Street". The New York Times. February 6, 1914. ISSN 0362-4331. Archived from the original on February 12, 2023. Retrieved February 12, 2023.
  44. ^ "Important Subway Matters Settled". The Standard Union. February 6, 1914. p. 1. Archived from the original on February 12, 2023. Retrieved February 12, 2023.
  45. ^ "42d Street an Express Stop.; A Big Victory for Brooklynites, Says The Brooklyn Eagle". The New York Times. February 8, 1914. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 1, 2017.
  46. ^ a b c "New Subway Work Now Going a Year; About Four-fifths of the Broadway-Lexington Avenue Line Is Under Construction". The New York Times. July 28, 1912. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  47. ^ "Broadway Subway Contract Awarded; Section 3 Goes to Underpinning & Foundation Co. If Board of Estimate Approves". The New York Times. January 13, 1912. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  48. ^ "Subway Bid $2,295,000". The Brooklyn Daily Eagle. January 11, 1912. p. 2. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  49. ^ "Subway Contract Awarded". The Brooklyn Daily Eagle. January 24, 1912. p. 1. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  50. ^ "Willcox Defends Wagner Subways Bill". The Sun. March 23, 1912. p. 5. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  51. ^ "Worried by Fight Over Subway Bill; City Officials Fear Defeat of Amendments May Destroy Plans for Traction Relief". The New York Times. March 23, 1912. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  52. ^ "Subway Contracts for $8,292,721.40". The Brooklyn Daily Eagle. September 16, 1912. p. 18. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  53. ^ "Ancient Prison Unearthed". Yonkers Statesman. April 6, 1914. p. 4. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  54. ^ "Plan for the B.R.T. Under Broadway; First to be Prepared for Letting Since the Signing of the Agreements". The New York Times. May 24, 1913. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  55. ^ "Open Bids for Subway; Dock Company Expected to Get First Section Advertised". The New York Times. June 25, 1913. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  56. ^ "Subway Progress". The Brooklyn Citizen. June 24, 1913. p. 1. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  57. ^ "Object to Lowest Subway Bidder; Broadway Association and Property Owners Want Broadway Contract Awarded the Next". The New York Times. July 10, 1913. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  58. ^ "Protest Lowest Bid on Subway". The Brooklyn Citizen. July 10, 1913. p. 2. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  59. ^ "Lower Broadway Subway Bid Stands; Service Board Overrules Objections of Property Owners on Evidence of Contractors". The New York Times. July 16, 1913. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  60. ^ "Subway Bulletin". The Brooklyn Daily Eagle. July 19, 1913. p. 20. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  61. ^ "New Subway Work Well Under Way; Some of the Lexington Avenue Sections Are More Than Half Completed". The New York Times. November 30, 1913. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  62. ^ "$101,000,000 Subway Work Under Way; Much Progress Made on Dual System in Year Since Signing of the Contracts". The New York Times. March 15, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  63. ^ "Canal Street Subway Plans". The New York Times. February 8, 1914. p. 78. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  64. ^ "Canal Street Subway; Low Lying Ground Adds to Cost of the Work". The New York Times. May 17, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  65. ^ a b c d "Canal St. Subway is One-third Done". The Standard Union. August 22, 1915. p. 16. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  66. ^ a b "Morgan Firm Waits on Subway Debate; Letter Setting a Time Limit on Financing Withdrawn for the Present". The New York Times. May 14, 1912. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  67. ^ "4th Ave. Subway to Open June 15". The Standard Union. June 5, 1915. p. 5. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  68. ^ a b c d "$2,000,000 A Month Going Into Subways; Work Well Under Way and All Contracts Soon Will Have Been Let". The New York Times. November 30, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  69. ^ "Tried to Hold Up Routes for Subway". The Brooklyn Daily Eagle. October 30, 1914. p. 9. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  70. ^ a b "Canal Street Subway; Completion of This Link at Once Will Save City Large Amount". The New York Times. January 23, 1916. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  71. ^ a b "Attacks Added Subway Costs: Realty Board Points Out That Idle Sections Are Responsible". New-York Tribune. July 17, 1916. p. 12. ISSN 1941-0646. ProQuest 575591960.
  72. ^ "Trying to Expedite Work on Subway: Various Plans Being Considered to Hasten Construction and Open Completed Sections". The New York Times. January 30, 1917. p. XX5. ISSN 0362-4331. ProQuest 98026139.
  73. ^ a b "While Finished Subways Lie Idle, City Loses $8,000,00". The Chat. February 20, 1915. p. 51. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  74. ^ "More Subway Building.: Public Service Board Calls for Bids for Broadway-Fourth Avenue Line". The Wall Street Journal. July 2, 1913. p. 7. ISSN 0099-9660. ProQuest 129344051.
  75. ^ "Subway's Progress Mars Union Square; Fine Old Shade Trees Fall Under the Axe and May Never Be Replaced in the Park". The New York Times. September 7, 1913. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  76. ^ "7,500 Men Building New Transit Lines: of 74 Contract Sections, 38 Are Awarded, Representing an Expenditure of $106,884,347". The New York Times. May 11, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  77. ^ "Ready for Subway to Greeley Square; Plans for Broadway Section, 26th to 38th Streets, Approved". The New York Times. April 1, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  78. ^ "Bids for Subways Under River Opened; Booth & Flinn and the O'Rourke Co. Offer to Bore Both Tubes for $12,461,000". The New York Times. May 23, 1914. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  79. ^ a b "Subway Progress". The Brooklyn Daily Eagle. November 28, 1914. p. 22. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  80. ^ a b "Open Bids on Dual System Sections". The Brooklyn Daily Eagle. July 27, 1915. p. 2. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  81. ^ a b "Receives Subway Bids Tomorrow". The Brooklyn Citizen. July 26, 1915. p. 6. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  82. ^ "Commission Will Prepare Contracts". The Standard Union. July 4, 1915. p. 16. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  83. ^ a b "Open New Subway Bids". The New York Times. July 28, 1915. p. 5. Archived from the original on May 15, 2023. Retrieved May 15, 2023 – via Newspapers.com.
  84. ^ "Broadway Subway to Be Long Delayed; Colonel T.S. Williams of B.R.T. Sees No Chance of Opening It Jan. 1, 1917". The New York Times. August 4, 1915. ISSN 0362-4331. Retrieved May 15, 2023.
  85. ^ a b "Manhattan to Coney by Tube Next Year". The Brooklyn Daily Eagle. February 22, 1916. p. 4. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  86. ^ a b "New Subway Trains to Run Within Year; The Times Square Section Will Be Completed, It Is Believed, by July, 1917". The New York Times. February 23, 1916. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  87. ^ "Urge New Station for Shoppers' Use". The Standard Union. March 12, 1916. p. 20. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  88. ^ "B.R.T. Blames City for Subway Delay; Annual Report Says Municipality Is Postponing Time When It Will Get Profits". The New York Times. July 27, 1916. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved April 30, 2023.
  89. ^ "B.R.T. Subway Trains Up Broadway Soon; Finishing Contracts Let and Traffic May Reach 14th Street by Spring". The New York Times. October 29, 1916. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  90. ^ "Award Contract for Station Finish". The New York Times. July 20, 1917. ISSN 0362-4331. Archived from the original on May 17, 2023. Retrieved May 17, 2023.
  91. ^ "Would Force B.R.T. To Operate Subway; Service Board Wants Broadway Line Between Canal and 14th Sts. Open June 1". The New York Times. February 25, 1917. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  92. ^ "To Supply Power for New Subways; Interborough Will Furnish Current for B. R. T. Lines Operated in Manhattan". The New York Times. May 20, 1917. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  93. ^ "Important Power Contracts Made by Interborough Company: Will Furnish Power to Subsidiaries of Brooklyn Rapid Transit Company". Electrical Review. Vol. 71, no. 23. December 8, 1917. p. 980. ProQuest 574445868.
  94. ^ "B. R. T. In Broadway". The Wall Street Journal. August 30, 1917. p. 6. ISSN 0099-9660. ProQuest 129625875.
  95. ^ "Brooklyn Trains To Run to 14th St. On September 4: Interborough Travellers Who Change at Chambers St. Can Then Save 5c". New-York Tribune. August 21, 1917. p. 12. ISSN 1941-0646. ProQuest 575741058.
  96. ^ "Broadway Subway Opened To Coney By Special Train. Brooklynites Try New Manhattan Link From Canal St. to Union Square. Go Via Fourth Ave. Tube". The Brooklyn Daily Eagle. September 4, 1917. Retrieved May 31, 2019.
  97. ^ "Open First Section of Broadway Line; Train Carrying 1,000 Passengers Runs from Fourteenth Street to Coney Island". The New York Times. September 5, 1917. ISSN 0362-4331. Archived from the original on June 12, 2018. Retrieved December 27, 2020.
  98. ^ a b c d "Open First Section Of Broadway Line; Train Carrying 1,000 Passengers Runs from Fourteenth Street to Coney Island. Regular Service Begins. New Road Is Expected to Relieve Old System of 15,000 PersonsDaily in Rush Hours. Service Commissioners Jubliant. Schedule Not Fully Arranged". The New York Times. September 5, 1917. ISSN 0362-4331. Archived from the original on June 12, 2018. Retrieved November 5, 2016.
  99. ^ "New Subway Open To 42d St. by Jan. 1: First Train September 4 Will Carry Committee From Brooklyn". New-York Tribune. August 26, 1917. p. 9. ISSN 1941-0646. ProQuest 575755715.
  100. ^ "New Subway Shifts Population Centres; Manhattan Dwellers Seeking Homes in Brooklyn Find Rents Going Up and Houses Scarce". The New York Times. October 28, 1917. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  101. ^ a b c d e f g h i j k l "Open New Subway To Times Square; Brooklyn Directly Connected with Wholesale and Shopping Districts of New York. Nickel Zone Is Extended. First Train in Broadway Tube Makes Run from Rector Street in 17 Minutes. Cost About $20,000,000 Rapid Transit from Downtown to Hotel and Theatre Sections Expected to Affect Surface Lines. Increases Five-Cent Zone. First Trip to Times Square. Benefits to Brooklyn" (PDF). The New York Times. January 6, 1918. ISSN 0362-4331. Archived (PDF) from the original on August 31, 2021. Retrieved November 5, 2016.
  102. ^ "New Broadway Subway Opened From 42d to Rector Street: First Train Carries B. R. T. and City Officials, With Representatives of Civic Organizations--Line Then Turned Over to Public". New-York Tribune. January 6, 1918. p. 17. ProQuest 575840136.
  103. ^ "Broadway Subway Line To Be Extended to 57th Street". New-York Tribune. July 4, 1919. p. 14. ISSN 1941-0646. ProQuest 576110371.
  104. ^ "Open New Subway July 9; B.R.T. Extension from Times Sq. to 57th St. to be Put Into Operation". The New York Times. July 4, 1919. ISSN 0362-4331. Archived from the original on May 3, 2023. Retrieved May 1, 2023.
  105. ^ "Changes in B.R.T. Service; Five-Car Trains for Broadway Subway to Manhattan". The New York Times. September 2, 1918. ISSN 0362-4331. Archived from the original on May 15, 2023. Retrieved May 15, 2023.
  106. ^ District, New York (State) Public Service Commission First (January 1, 1919). Report of the Public Service Commission for the First District of the State of New York. J.B. Lyon Company.
  107. ^ a b c d e f g h Report of the Public Service Commission For The First District Of The State of New York For The Year Ending December 31, 1919. New York State Public Service Commission. January 12, 1920. p. 131.
  108. ^ a b c d "Broadway End of Subway Opened; First Passenger Train Sent at Midnight Over Route from Times Square to 57th St. Earlier Special Trip. Party of Officials and Citizen Delegations Taken Over New Tracks and to Coney Island" (PDF). The New York Times. July 10, 1919. ISSN 0362-4331. Archived (PDF) from the original on May 30, 2020. Retrieved November 5, 2016.
  109. ^ a b c "Subway To Open Two New Stations; Broadway Line of B.R.T. Will Extend to Lexington Av. and 60th St. Tomorrow. An Entrance at Fifth Av. Central Manhattan to Have Direct Service to All Brooklyn and Coney Island. Express to Times Square. Tunnel to Queens tow Under Way and Expected to be in Use in Six Months". The New York Times. August 31, 1919. ISSN 0362-4331. Archived from the original on June 14, 2018. Retrieved May 31, 2019.
  110. ^ "New B.R.T. Lines Open.; Broadway-Brighton Trains, on Holiday Schedule, Have Light Traffic" (PDF). The New York Times. August 2, 1920. ISSN 0362-4331. Archived (PDF) from the original on May 4, 2022. Retrieved November 5, 2016.
  111. ^ "Broadway-Fifty-Ninth Street Extension of B.R.T. Subway". The New York Times. August 1, 1920. p. 92. Archived from the original on May 4, 2022. Retrieved May 31, 2019.
  112. ^ a b "B. M, T. Station Lengthening Is Nearly Finished: 76 Platforms Are Extended 3,186 Feet to Make Room for 126.000 Additional Passengers in Rush Hours City Carried Out Work I.R.T. Changes Planned, but That Company Refuses to Pay Its Share of Costs". New York Herald Tribune. August 2, 1927. p. 32. ISSN 1941-0646. ProQuest 1113704092.
  113. ^ "Bids for B.M.T. Stations; Platforms South of Fourteenth Street to Be Lengthened". The New York Times. July 8, 1926. ISSN 0362-4331. Archived from the original on April 28, 2023. Retrieved April 28, 2023.
  114. ^ "B.M.T. to Operate Eight-car Trains; Platforms in Forty Stations Are Lengthened, Increasing Capacity 33 1-3%". The New York Times. August 2, 1927. ISSN 0362-4331. Archived from the original on May 12, 2023. Retrieved May 12, 2023.
  115. ^ New York City Transit Authority Annual Report For The Year June 30, 1960. New York City Transit Authority. 1960. pp. 16–17.
  116. ^ Rogoff, Dave (February 1969). "BMT Broadway Subway Platform Extensions" (PDF). New York Division Bulletin. 12 (1). Electric Railroaders' Association: 3–4. Archived from the original (PDF) on September 15, 2020. Retrieved December 27, 2020.
  117. ^ a b Burks, Edward C. (February 21, 1970). "Subways' Colored Tile Gets Cover-Up Job". The New York Times. ISSN 0362-4331. Archived from the original on November 6, 2020. Retrieved April 7, 2020.
  118. ^ Perlmutter, Emanuel (November 27, 1967). "BMT-IND Changes Bewilder Many – Transit Authority Swamped With Calls From Riders as New System Starts". The New York Times. p. 1. Archived from the original on June 16, 2018. Retrieved August 23, 2015.
  119. ^ Sparberg, Andrew J. (October 1, 2014). From a Nickel to a Token: The Journey from Board of Transportation to MTA. Fordham University Press. ISBN 978-0-8232-6190-1.
  120. ^ "The JoeKorNer Brochures". thejoekorner.com. Archived from the original on March 10, 2016. Retrieved November 6, 2016.
  121. ^ "Hey, What's a "K" train". Flickr. New York City Transit Authority. 1985. Archived from the original on September 15, 2016. Retrieved June 17, 2016.
  122. ^ "If You Ride These Subway Lines, You Know Something Drastic Has To Be Done". thejoekorner.com. New York City Transit Authority. April 1986. Archived from the original on May 10, 2017. Retrieved November 6, 2016.
  123. ^ "Announcing Service Changes On The N and R Routes Beginning May 24, 1987 New Routes Mean Better Service". subwaynut.com. New York City Transit Authority. May 1987. Archived from the original on August 19, 2016. Retrieved August 31, 2016.
  124. ^ a b "Service Changes September 30, 1990" (PDF). subwaynut.com. New York City Transit Authority. September 30, 1990. Archived from the original (PDF) on October 26, 2014. Retrieved May 1, 2016.
  125. ^ "System-Wide Changes In Subway Service Effective Sunday, December 11, 1988". Flickr. New York City Transit Authority. 1988. Archived from the original on September 15, 2016. Retrieved October 30, 2016.
  126. ^ Johnson, Kirk (December 9, 1988). "Big Changes For Subways Are to Begin". The New York Times. ISSN 0362-4331. Archived from the original on March 8, 2021. Retrieved October 30, 2016.
  127. ^ Chiasson, George (October 2010). "A History Of The R Train". New York Division Bulletin. 53 (10). New York Division, Electric Railroaders' Association. Archived from the original on August 19, 2016. Retrieved August 31, 2016 – via Issu.
  128. ^ Hevesi, Dennis (December 28, 1990). "Hazards Halt Manhattan Bridge Subway Line". The New York Times. Archived from the original on December 20, 2013. Retrieved March 18, 2010.
  129. ^ Sims, Calvin (January 8, 1991). "New York Reopened Bridge Subway Line In Spite of Warnings". The New York Times. Archived from the original on December 20, 2013. Retrieved March 18, 2010.
  130. ^ "Special Alert! The Transit Authority has announced the following major subway service changes for this weekend". New York Daily News. December 28, 1990. Archived from the original on June 7, 2019. Retrieved December 29, 2018.
  131. ^ Sullivan, Ronald (March 26, 1995). "Bridge Repairs to Disrupt Off-Peak Subway Service". The New York Times. ISSN 0362-4331. Archived from the original on August 19, 2016. Retrieved November 6, 2016.
  132. ^ "The JoeKorNer Brochures". Archived from the original on March 5, 2016. Retrieved October 23, 2016.
  133. ^ "S Train Special Shuttle to 21 St/Queensbridge". thejoekorner.com. New York City Transit. February 1998. Archived from the original on March 5, 2016. Retrieved November 6, 2016.
  134. ^ Lemire, Jonathan; Donohue, Pete (July 25, 2001). "Big Crush at Subway Station With Reroutings". New York Daily News. p. 3. ISSN 2692-1251. ProQuest 305613525.
  135. ^ Dewan, Shaila K. (July 23, 2001). "For Riders, Many Riddles, Written in Q's, D's and W's". The New York Times. ISSN 0362-4331. Archived from the original on September 29, 2015. Retrieved May 16, 2023.
  136. ^ Luo, Michael (February 20, 2004). "A Subway Map Remade, in Hopes of Matching Routes and Riders". The New York Times. ISSN 0362-4331. Archived from the original on October 18, 2022. Retrieved November 5, 2016.
  137. ^ Grynbaum, Michael (June 28, 2010). "CITY ROOM; On W Train, a Party Before a Final Stop: History". The New York Times. ISSN 0362-4331. Archived from the original on February 9, 2010. Retrieved November 5, 2016.
  138. ^ "MTA | Press Release | NYC Transit | Overnight Q Trains to Serve All Stops in Manhattan Effective December 2014". www.mta.info. April 23, 2014. Archived from the original on August 21, 2016. Retrieved November 5, 2016.
  139. ^ a b Martinez, Jose (February 19, 2016). "MTA Confirms W Train is Coming Back". TWC News. Archived from the original on July 3, 2018. Retrieved February 19, 2016.
  140. ^ a b "MTA Advances Work On Second Avenue Subway Service". mta.info. February 19, 2016. Archived from the original on February 22, 2016. Retrieved February 19, 2016.
  141. ^ "NQRW Guide". mta.info. Archived from the original on November 3, 2016. Retrieved November 5, 2016.
  142. ^ * Slotnik, Daniel E.; Wolfe, Jonathan; Fitzsimmons, Emma G.; Palmer, Emily; Remnick, Noah (January 1, 2017). "Opening of Second Avenue Subway: Updates". The New York Times. ISSN 0362-4331. Archived from the original on January 1, 2017. Retrieved January 1, 2017.
  143. ^ Andres, Czarinna (September 18, 2024). "MTA Unveils $68.4 Billion Capital Plan to Modernize NYC Transit – but Funding Questions Amid Congestion Pricing Pause Remain". amNewYork. Retrieved September 19, 2024.
  144. ^ Burkett, N.J. (September 18, 2024). "MTA Proposes Five-Year Capital Plan Wish List Including Replacing All Subway Cars". ABC7 New York. Retrieved September 19, 2024.
[edit]
KML is from Wikidata
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy