Jump to content

Huskur Road metro station

Coordinates: 12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E / 12.83901; 77.67754
From Wikipedia, the free encyclopedia

Huskur Road
Namma Metro station
Final stages of this metro station as of April 2024
General information
Other namesVeerasandra
LocationVeerasandra, Electronic City, Bengaluru, Karnataka 560100
Coordinates12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E / 12.83901; 77.67754
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningApril 2025; 2 months' time (April 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Konappana Agrahara Yellow Line
(Operational around April 2025)
Hebbagodi
towards Bommasandra
Location
Map

Huskur Road (also known as Veerasandra) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

As per latest reports, the Yellow Line is slated to be operational around April 2025[1] instead of January 2025[2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.[3]

History

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Huskur Road metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[4] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

Station Layout (TBC)

Huskur Road track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Biocon Hebbagodi
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Infosys Foundation Konappana Agrahara
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 25 March 2017. Retrieved 23 October 2024.
[edit]
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy