In order to include the cost on integration in the build or buy decision T368163: [EPIC] FY 24/25 SDS 2.1.1 POC Integration tests of 3rd Party experimentation engine solutions , we need to create and compile the following information:
- Initial Assessment:
- Review existing documentation on the third-party system
- Identify key stakeholders and points of contact
- Determine the primary goals and requirements of the integration
- Technical Analysis:
- Analyze the third-party API or integration methods
- Identify data exchange formats and protocols
- Assess security requirements and authentication methods
- Evaluate potential impact on existing systems and infrastructure
- Architecture Planning:
- Design the high-level architecture for the integration
- Identify necessary components and services
- Plan for scalability and performance requirements
- Determine data storage and caching needs
- Set of diagrams:
- Architecture diagram of the components and their interfaces, what currently exists, what would need to be built, and the specific touch points with the 3rd party system.
- Component descriptions of each major component, the role of each component in the system, and the technologies or frameworks used
- Data flow diagram that describes in detail how data moves through the integrated system.
- Security architecture overview that describes security measures for data in transit and at rest, authentication and authorization mechanisms, and compliance with security standards
- Architecture diagram of the components and their interfaces, what currently exists, what would need to be built, and the specific touch points with the 3rd party system.
- Scalability & performance
- Identify potential bottlenecks
- Strategy for handling increased load
- Error handling and resilience strategy
- Approach for handling failures in the integration
- Monitoring and logging plan
- Deployment plan
- Summary of the tech stack with justification of choices
- Assumptions and constraints that influence the architecture
- Development Planning:
- Break down the integration into manageable tasks
- Estimate time and resources required for each task
- Identify potential risks and mitigation strategies
- Plan for necessary testing at each stage of development
- Describe a phased approach that includes the dependencies between different components
- Maintenance plan